Save this project to account
Connected planning records

Temporary/event, PCI Pharma Services, Block 08 City North Business Campus... - Planning Application 2560057

Meath County Council · 2560057 · Meath

Latest linked evidence

Notified commencement · 2025-06-04

SN0012570MH · The proposed development will consist of both internal and external modifications to the permitted development comprising: 1) On the ground floor, the reconfiguration of the approved layout to allow for: a) the construction of a commercial-grade kitchen, staff canteen and associated store facilities, b) construction of a cold/freezer store, c) addition of GMP corridor, garbing and training areas, and engineering workshop, d) creation of new quality control inspection areas, e) new locker room and associated spaces, f) 2 no. production lines and area for future production line, and g) enclosed compactor area. 2) On the first floor, the reconfiguration of the approved layout to allow for: a) new administrative offices, meeting and training rooms, prayer room, and nursing room, b) a pallet gate and goods lift, c) construction of additional protected stairways and corridors, d) new open plan mezzanine, 4,360sqm in area, to provide for future production area, and e) new QC inspection office. 3) Externally, a) Installation of outdoor plant elements, including chillers and generators, and b) fire escape doors and stairways and corresponding pathways. The proposed development includes for the removal of condition No.5 of Reg. Ref. 23/60046 to better reflect to nature of the industrial warehousing and logistics/distribution use of the facility. All office space will remain ancillary to these uses. The proposed development also includes the omission of the permitted temporary wastewate

Indexed observation: Granted. Read the linked decisions for their full terms.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    2560057

  2. Planning decision

    2560057

    Conditional permission

  3. Grant date recorded

    2560057

  4. Notified commencement

    SN0012570MH

    The proposed development will consist of both internal and external modifications to the permitted development comprising: 1) On the ground floor, the reconfiguration of the approved layout to allow for: a) the construction of a commercial-grade kitchen, staff canteen and associated store facilities, b) construction of a cold/freezer store, c) addition of GMP corridor, garbing and training areas, and engineering workshop, d) creation of new quality control inspection areas, e) new locker room and associated spaces, f) 2 no. production lines and area for future production line, and g) enclosed compactor area. 2) On the first floor, the reconfiguration of the approved layout to allow for: a) new administrative offices, meeting and training rooms, prayer room, and nursing room, b) a pallet gate and goods lift, c) construction of additional protected stairways and corridors, d) new open plan mezzanine, 4,360sqm in area, to provide for future production area, and e) new QC inspection office. 3) Externally, a) Installation of outdoor plant elements, including chillers and generators, and b) fire escape doors and stairways and corresponding pathways. The proposed development includes for the removal of condition No.5 of Reg. Ref. 23/60046 to better reflect to nature of the industrial warehousing and logistics/distribution use of the facility. All office space will remain ancillary to these uses. The proposed development also includes the omission of the permitted temporary wastewate

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.