Connected planning records

Planning case F21A0201

Fingal County Council · F21A0201 · Rush, Dublin

Latest linked evidence

Notified commencement · 2022-06-23

The demolition of the existing glass house structure and for the construction of a new storey and a half dwelling. The accommodation will comprise entrance hall, accessible toilet and playroom to the front elevation. Kitchen, utility room, dining and livingroom to the rear elevation at ground floor level. 3 bedrooms at first floor level comprising two bedrooms to the front elevation with 2 roof dormers, master-bedroom with roof dormer to the rear elevation, en-suite bathroom, walk-in wardrobe, main bathroom and office/study

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    F21A0201

    Official source

  2. Planning decision

    F21A0201

    Permission granted

    Official source

  3. Grant date recorded

    F21A0201

    Official source

  4. Notified commencement

    Commencement notice

    The demolition of the existing glass house structure and for the construction of a new storey and a half dwelling. The accommodation will comprise entrance hall, accessible toilet and playroom to the front elevation. Kitchen, utility room, dining and livingroom to the rear elevation at ground floor level. 3 bedrooms at first floor level comprising two bedrooms to the front elevation with 2 roof dormers, master-bedroom with roof dormer to the rear elevation, en-suite bathroom, walk-in wardrobe, main bathroom and office/study

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.