Latest linked evidence
Notified commencement · 2022-09-26
The development will comprise the construction of a 500m2 detached two storey building generally within the footprint of the former school building and playground (demolished after fire damage in 1992) to include a shared incubator community based kitchen with hospitality, tuition space, demonstration kitchen together with ancillary food preparation and storage, toilet and changing facilities within the building. Reconfiguration to the existing car park to the rear of the former St. Paul's Church will reduce the no. of parking spaces to the rear to 18 along with a delivery drop off and collection zone. 10 additional cycle spaces shall be provided. The two-storey building will include rooftop machinery and plant, photovoltaic panels and rooflights located behind the parapet wall at roof level. The grounds of the former graveyard to the west of the building shall be landscaped and planted with raised flower beds with a grass boarder, bench seating and a memorial plaque placed on the southern boundary wall. Connections are required to existing drainage, foul water, potable water, and utility services located to the north of the building. No works or alterations are proposed to the former St. Paul's Church which is a Recorded Monument (DU) and Protected Structure and lies within a zone of Archaeological Interest.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.