Latest linked evidence
Notified commencement · 2025-09-22
The development will consist of: The restoration and refurbishment of the existing semi-detached house. Ground floor works will include relocating kitchen and dining from rear return to entrance level. Internal alterations at ground floor level to include removal of selected doors and the reinstatement of former opening between relocated kitchen and dining room and the installation of folding doors. Works also include altering opes in rear return and to rear facade to allow for French doors to rear garden and closing the door ope to side garden. Selected non-original walls to be removed as part of the works. Mezzanine floor works include new ensuite and removal of door to boot room. First floor works include new fit out of existing family bathroom and removal of high-level glazed screen to adjoining bedroom. Works also include part removal of non-original wall to guest bedroom and the refurbishment of toilet (off landing). Alterations include the provision of new master ensuite accessed via new double doors from the master bedroom. Attic room works include replacement of the dormer window only. Ground floor joists to be insulated with approved breathable insulation from below (basement / cellar level). Externally, works will include new landscaping to gardens. Alterations to facilitate works will include internal refurbishment works including the upgrading and replacement of selected mechanical and electrical services and installation of underfloor heating (sitting above reta
Indexed observation: Granted. Read the linked decisions for their full terms.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.