Connected planning records

Planning case 17331

Waterford City and County Council · 17331 · Lismore, Waterford

Latest linked evidence

Notified commencement · 2022-09-28

CN0094149WD · Phase 2 of a 3 phase construction contract comprising Demolition of existing 6 Classroom block, Refurbishment of existing main school building and former County Library (comprising a former Monastery Building, a Protected Structure, and existing contemporary extension), together with new 1,142 sq.m. single storey extension, new 50 sq. m. external Store and associated siteworks

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    17331

  2. Planning decision

    17331

    Conditional permission

  3. Grant date recorded

    17331

  4. Notified commencement

    CN0079549WD

    This application is for Phase 1 of a 3 phase development teh overall extent of which includes the removal of 2x No. temporary prefabricated structures, the demolition of an existing 410.6m² single storey post primary school building extension, the demolition of an 148m² single storey services building, the demolition of a 19.6m² boiler house and a 9.5m² shed within the curtilage of a structure that is recommended for inclusion on the Local Authority’s Record of Protected Structures, the provision of a new 1231.5m² single storey post primary school extension, the provision of a new 3312.3m² two-storey post primary school extension, and associated new single storey links and new two-storey link, the provision of a new 49.5m² single storey external store and a new 36m² covered space, including all new works to the existing 4x No. buildings to be retained, and all associated ancillary developments and associated site works. Phase 1 includes the the provision of a new 3312.3m² two-storey post primary school extension, and associated new single storey links and new two-storey link and works t teh PE Hall (Building no. 3). Separate Commencement notices will be lodged toward the end of Phase 1 for Phases 2a and 2b.

    Quantity not established for this notice.

    · Notice evidence

  5. Notified commencement

    CN0094149WD

    Phase 2 of a 3 phase construction contract comprising Demolition of existing 6 Classroom block, Refurbishment of existing main school building and former County Library (comprising a former Monastery Building, a Protected Structure, and existing contemporary extension), together with new 1,142 sq.m. single storey extension, new 50 sq. m. external Store and associated siteworks

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.