Latest linked evidence
Notified commencement · 2020-10-14
CN0069255CE · A new housing estate development at Doonaun, Tulla, Co.Clare consisting of: a) 25 no. residential units comprising of: • 1 no. 4-bedroom house, single-storey, semi-detached, i.e. Type A • 1 no. 4-bedroom houses two-storey, semi-detached, i.e. Type B. • 6 no. 3 bedroom house, two-storey, semi- detached, i.e. Type C. • 6 no. 3 bedroom house, two-storey, semi- detached, i.e. Type D. • 8 no. 2-bedroom apartments, two-storey, semi-detached i.e. Type E. • 3 no. 3-bedroom house, single-storey semi-detached/detached, i.e. Type F. b) 34 ancillary car parking spaces within the development. c) The construction of pedestrian access point to the site. d) New vehicular access point to the site. e) Pedestrian link to the adjoining O’Reilly Park housing estate. f) On-site sewage pumping station with rising main connection to main sewer. g) Alterations to ground levels to accommodate the development. h) Surface water management will include attenuation and discharge to surface water network. i) All ancillary site works to include boundary and landscaping works
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.