Planning case D17A0373

Dun Laoghaire Rathdown County Council · D17A0373 · Dalkey, Dublin

Latest linked evidence

Notified commencement · 2017-08-09

OPT OUT - Construction of a new 18sq.m. first floor level extension to the side with pitched roof over to match existing, 2 no. new dormer windows to the front elevation & 3 no. new dormer windows to the rear elevation. A 28sq.m. ground floor level extension to the rear with flat roof over. A 54.5sq.m. basement level extension to the rear with flat roof terraced area over and a 2.5sq.m. pitched roof porch to the front of the existing two storey semi detached bungalow. Widen the existing driveway entrance by 500mm and To include ancillary works at 5 Knock Na Cree Park, Dalkey, Co. Dublin.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D17A0373

  2. Planning decision

    D17A0373

    Permission granted

  3. Grant date recorded

    D17A0373

  4. Notified commencement

    Commencement notice

    OPT OUT - Construction of a new 18sq.m. first floor level extension to the side with pitched roof over to match existing, 2 no. new dormer windows to the front elevation & 3 no. new dormer windows to the rear elevation. A 28sq.m. ground floor level extension to the rear with flat roof over. A 54.5sq.m. basement level extension to the rear with flat roof terraced area over and a 2.5sq.m. pitched roof porch to the front of the existing two storey semi detached bungalow. Widen the existing driveway entrance by 500mm and To include ancillary works at 5 Knock Na Cree Park, Dalkey, Co. Dublin.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.