Latest linked evidence
Notified commencement · 2018-02-26
To construct an equine breeding centre and farm yard buildings. The development will consist of 4 no. Blocks arranged around a central courtyard. Block 1 will consist of a covered horse walker and lunge ring. Block 2 will consist of 14 no. Stables with wash bay, vet room, tack room and hay/feed store at ground floor and an office space over one half section at first floor. Block 3 will consist of 6 no. stables to one side with cattle shed to the other with overhang roof. Block 4 will consist of a hay store and machinery storage barn. Permission also sought for:- (a) to construct a covered muck heap storage area. (b) to construct an underground soiled water holding tank. (c) a secondary effluent treatment system with a sand filter percolation area to serve the proposed facility. (d) to relocate and upgrade the existing farm entrance approx. 12m to the north of its existing location for the purpose of improving sight lines. (e) lay an access roadway from the public road to the farm yard which is located immediately after the existing stream which traverses the land. (f) to carry out land drainage work on the field adjacent to the roadway by the laying of a 225 pipe diameter from the proposed new entrance to the stream with herring bone minor drains feeding into main drain
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.