Planning case 247619

Dublin City Council · 247619 · Dublin City, Dublin

Latest linked evidence

Notified commencement · 2024-08-15

Construction of a new 5-storey over ground level extension to the rear of a hotel at 89-90 Gardiner Street Lower, Dublin 1, a protected structure. The extension fronts onto Mabbot lane with two no. entrance doors, connection to existing hotel on ground floor, provision of additional bedrooms only, two no. stairs and a lift. Piled foundation, Steel Frame, metal deck floors, cavity walls with brick face, rainscreen to part of top floor, and a flat roof.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Notified commencement

    Commencement notice

    7-Day Notice - Change of use from assembly to retail at the Gala Building, 363 Ballyfermot Road, Dublin 10.

    Quantity not established for this notice.

    · Notice evidence

  2. Planning application received

    247619

  3. Planning decision

    247619

    Permission granted

  4. Grant date recorded

    247619

  5. Notified commencement

    Commencement notice

    Construction of a new 5-storey over ground level extension to the rear of a hotel at 89-90 Gardiner Street Lower, Dublin 1, a protected structure. The extension fronts onto Mabbot lane with two no. entrance doors, connection to existing hotel on ground floor, provision of additional bedrooms only, two no. stairs and a lift. Piled foundation, Steel Frame, metal deck floors, cavity walls with brick face, rainscreen to part of top floor, and a flat roof.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.