Latest linked evidence
Notified commencement · 2016-04-26
'Opt Out' The development will consist of works to the existing two storey Nerano House that will include: - the removal of existing single storey conservatory and its replacement with new single storey sunroom to south-east of main house; - the removal of two storey wing to the south, and two storey return to the rear of the main house, and their replacement with extended new part single / two storey wing with external terrace and new part single / two storey return; - removal of bay windows and canopy and their replacement with new bay windows to front of main house; - new spiral staircase within courtyard connecting to coach-house to be converted into ancillary guest accommodation on first floor, and gym on ground floor level; - new garage extension to north-west of the coach-house; - minor internal reconfigurations and external works to the house / coach-house that include minor elevation changes as a result of alterations to, and new, window and door openings. The development will also include the following works to the Gate Lodge: - removal of existing single storey extension and replacement with new single storey extension to its rear, that will reduce the boundary wall height to Nerano Road, and minor internal reconfigurations. The development will also include utilizing and widening of vehicular entrance off Nerano Road to 3.5m and the removal of existing gates, and erection of replacement gates; as well as minor widening of the existing vehicular access road. Reopen
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.