Notified commencement · 2024-04-04
Alterations and extensions to the existing an post Sligo Delivery Service Unit building to include for a new single storey temporary structure (10m x 30m x 5.5m tall) and temporary connecting link corridor (5m x 5m. x 5.5m tall) both located to the rear (northern) elevation of the existing building. The proposed temporary building would be in place for a period of between 7 to 10 years and consists of a hard shell marquee type structure with a double skinned pvc material, fully tensioned roof and all associated site development works
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.