Connected planning records

Planning case 19143

Kerry County Council · 19143 · Tralee, Kerry

Latest linked evidence

Notified commencement · 2020-02-04

REFURBISH AND EXTEND EXISTING COTTAGE. DEMOLISH EXISTING DINING/BATHROOM AND BOILER TO REAR, REPLACE FRONT DOOR WITH NEW WINDOW AND OTHER ANCILLARY ELEVATIONAL CHANGES, CONSTRUCT NEW PITCHED ROOF EXTENSION TO THE SOUTH WITH A FLAT ROOF LINK IN BETWEEN INCORPORATING ADDITIONAL LIVING SPACE/PLAYROOM/UTILITY AND BATHROOM, BUILD NEW REAR BOUNDARY WALL AND ENTRANCE, DECOMMISSION AND REMOVE EXISTING SEPTIC TANK / SOAKAWAY AND REPLACE WITH NEW WASTEWATER TREATMENT UNIT AND POLISHING FILTER COMPLETE WITH ALL ANCILLARY SITE WORKS ASSOCIATED WITH THE DEVELOPMENT AND RETENTION PERMISSION TO RETAIN EXISTING GARAGE/SHED AS BUILT ON SITE

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    19143

  2. Planning decision

    19143

    Conditional permission

  3. Grant date recorded

    19143

  4. Notified commencement

    Commencement notice

    REFURBISH AND EXTEND EXISTING COTTAGE. DEMOLISH EXISTING DINING/BATHROOM AND BOILER TO REAR, REPLACE FRONT DOOR WITH NEW WINDOW AND OTHER ANCILLARY ELEVATIONAL CHANGES, CONSTRUCT NEW PITCHED ROOF EXTENSION TO THE SOUTH WITH A FLAT ROOF LINK IN BETWEEN INCORPORATING ADDITIONAL LIVING SPACE/PLAYROOM/UTILITY AND BATHROOM, BUILD NEW REAR BOUNDARY WALL AND ENTRANCE, DECOMMISSION AND REMOVE EXISTING SEPTIC TANK / SOAKAWAY AND REPLACE WITH NEW WASTEWATER TREATMENT UNIT AND POLISHING FILTER COMPLETE WITH ALL ANCILLARY SITE WORKS ASSOCIATED WITH THE DEVELOPMENT AND RETENTION PERMISSION TO RETAIN EXISTING GARAGE/SHED AS BUILT ON SITE

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.