Dun Laoghaire Rathdown County Council · DZ17A0862 · Dublin 18, Dublin
Latest linked evidence
Notified commencement · 2024-01-26
SN0009661DR · Fit out of the Cherrywood TC 1 amenities area of the TC1 development of the scheme which consists of three residential blocks (A1, A2 & A3) situated over two shared basement levels at Cherrywood Town Centre, TC1, Cherrywood, Dublin 22.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.
Source history
Timeline
Planning application received
DZ17A0862
Grant date recorded
DZ17A0862
Planning decision
DZ17A0862
Permission granted
Notified commencement
CN0055435DR
Construction of two mixed use blocks situated over a shared basement level (basement / podium previously commenced BCMS Ref: 8417855), TC2 Blocks C1 and C2, containing a total of 431 apartment units, associated common areas and communal facilities to include fitness centre and creche, retail units, landscaping works to include public realm works and the construction of a central common space and two shared courtyards, at TC2, Cherrywood, Dublin 18.
431 units stated for this notice or phase; not a project total.
The construction of a new 5&6 storey residential building (Block F2) containing 212 apartments, associated common areas and communal facilities, cafe unit and ancillary accommodation. Landscaping works to include public realm works, the construction of a new street, and the construction of a shared courtyard. The construction of a single level basement which includes accommodation directly associated with Block F2.
The construction of two new residential buildings of 5 to 8 storeys (Blocks F1 and F3), containing 308 apartments, associated common areas and communal facilities, retail units and ancillary accommodation. Landscaping works to include public realm works, the construction of a new street, and the construction of a shared courtyard. The construction of a double level basement which includes accommodation directly associated with Blocks F1 and F3 at Cherrywood, Dublin 18
308 units stated for this notice or phase; not a project total.
Construction of a new Loop Access Ramp Structure serving the basement car park at TC1 Cherrywood. This commencement relates to the structure of the ramp only. The remainder of the works to the ramp will be undertaken and certified as part of the construction of the basement to be commenced under separate notice.
Commencement of site enabling works including installation of temporary pumps and on-site treatment filtration system to allow for construction of the 3 mixed use block over 2 levels of basement at TC1 Cherrywood, Dublin 18.
1 units stated for this notice or phase; not a project total.
Fit out of the Cherrywood TC 1 amenities area of the TC1 development of the scheme which consists of three residential blocks (A1, A2 & A3) situated over two shared basement levels at Cherrywood Town Centre, TC1, Cherrywood, Dublin 22.
Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.
Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.