Connected planning records

Planning case LRD0053S3

Fingal County Council · LRD0053S3

Latest linked evidence

Planning decision · 2026-08-04

LRD0053S3 · Permission granted

Open official source

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Reviewed build intelligence

What is being built

Government document review

The original October 2025 description has 398 dwellings. The council CE order signed 4 August 2026 incorporates 10 June revised plans and states 433 dwellings. This is Phase 3 of Ballymastone, now under appeal in ACP324603; no final grant is recorded.

2 official documents inspected · Checked 2026-09-05 · Official file index

The council decision revises Phase 3 from 398 to 433 dwellings

Council decision under appeal · Ballymastone Phase 3 only; earlier Phases 1 and 2 are separate linked permissions

What the evidence says
The original description is 227 houses, 47 duplex units and 124 apartments, totalling 398. Condition 3 on PDF page 104 states 433: 231 houses, 47 duplex units and 155 apartments. Condition 1 incorporates the 10 June 2026 revised plans.

Ballymastone Phase 3 only; earlier Phases 1 and 2 are separate linked permissions 398 original description versus 433 revised council condition is a dated supersession, not two additive schemes

Why it may matter — interpretation
Interpretation for planners and estimators: the dated revision supersedes the original application scale for the council decision, while the pending appeal still controls final status.

What is not established
No final Commission outcome, installed count or available contract is established. Check the eventual appeal order and final schedule before treating 433 as a completed or unconditionally permitted project.

Inspect the evidence

Fingal CE order for LRD0053/S3 · p.104
Inspected PDF page 104 · Issued 2026-08-04 · Signed decision incorporating further information received 10 June 2026; scanned conditions retain handwritten amendments · Checked 2026-09-05

433 no. residential units

Childcare and community space must be ready in the first phase

Council decision under appeal · First construction phase inside Ballymastone Phase 3, not Phase 1 of the wider development

What the evidence says
Condition 6 requires the further-information phasing drawing 23010-MDO-ZZZZ-XX-DR-A01-053303 unless otherwise agreed before commencement. It requires childcare and community floorspace fully fitted and suitable for immediate occupation and operation as part of the first phase.

First construction phase inside Ballymastone Phase 3, not Phase 1 of the wider development

Why it may matter — interpretation
Interpretation for fit-out and services teams: the council condition creates a specific programme interface between early housing and community facilities.

What is not established
The fit-out design, operator appointment, works contract and satisfaction of the condition are unknown. Confirm the phasing drawing and eventual appeal outcome.

Inspect the evidence

Fingal CE order for LRD0053/S3 · p.105
Inspected PDF page 105 · Issued 2026-08-04 · Signed decision incorporating further information received 10 June 2026; scanned conditions retain handwritten amendments · Checked 2026-09-05

fully fitted out and suitable for immediate occupation

The revised calculation schedules 110 luminaires across 24 circuits

Proposed calculation; not measured consumption · Circuits enumerated in revision 00 of the submitted calculation; not an installed whole-development count

What the evidence says
The eight-page May 2026 calculation labels Ballymastone Phase 3 and lists 24 distinct lighting circuits. Summing their explicit luminaire counts gives 110. It distinguishes P4 and P5 lighting classes and models 4,150 dusk-to-dawn operating hours annually.

Circuits enumerated in revision 00 of the submitted calculation; not an installed whole-development count Calculated from the 24 labelled circuits on PDF pages 1–8: page subtotals 13 + 12 + 14 + 17 + 13 + 13 + 12 + 16 = 110 luminaires. This is a calculation, not an installed count.

Why it may matter — interpretation
Interpretation for electrical and public-lighting designers: the circuit-level schedule provides a specific basis for checking the coordinated lighting layout and electrical loads.

What is not established
This is a calculation, not measured consumption or an equipment award. Product brands, final approved circuit layout and installation are not established. Confirm the council-approved lighting drawing.

Inspect the evidence

Ballymastone Phase 3 Energy Consumption Calculation · p.1
Inspected PDF page 1 · Issued May 2026 (month only) · Revision 00; catalogued as Energy Consumption AI received 5 June 2026; internal PDF metadata title differs from visible project/document title · Checked 2026-09-05

Energy Consumption Calculation

Ballymastone Phase 3 Energy Consumption Calculation · p.2
Inspected PDF page 2 · Issued May 2026 (month only) · Revision 00; catalogued as Energy Consumption AI received 5 June 2026; internal PDF metadata title differs from visible project/document title · Checked 2026-09-05

Energy Consumption Calculation

Ballymastone Phase 3 Energy Consumption Calculation · p.3
Inspected PDF page 3 · Issued May 2026 (month only) · Revision 00; catalogued as Energy Consumption AI received 5 June 2026; internal PDF metadata title differs from visible project/document title · Checked 2026-09-05

Energy Consumption Calculation

Ballymastone Phase 3 Energy Consumption Calculation · p.4
Inspected PDF page 4 · Issued May 2026 (month only) · Revision 00; catalogued as Energy Consumption AI received 5 June 2026; internal PDF metadata title differs from visible project/document title · Checked 2026-09-05

Energy Consumption Calculation

Ballymastone Phase 3 Energy Consumption Calculation · p.5
Inspected PDF page 5 · Issued May 2026 (month only) · Revision 00; catalogued as Energy Consumption AI received 5 June 2026; internal PDF metadata title differs from visible project/document title · Checked 2026-09-05

Energy Consumption Calculation

Ballymastone Phase 3 Energy Consumption Calculation · p.6
Inspected PDF page 6 · Issued May 2026 (month only) · Revision 00; catalogued as Energy Consumption AI received 5 June 2026; internal PDF metadata title differs from visible project/document title · Checked 2026-09-05

Energy Consumption Calculation

Ballymastone Phase 3 Energy Consumption Calculation · p.7
Inspected PDF page 7 · Issued May 2026 (month only) · Revision 00; catalogued as Energy Consumption AI received 5 June 2026; internal PDF metadata title differs from visible project/document title · Checked 2026-09-05

Energy Consumption Calculation

Ballymastone Phase 3 Energy Consumption Calculation · p.8
Inspected PDF page 8 · Issued May 2026 (month only) · Revision 00; catalogued as Energy Consumption AI received 5 June 2026; internal PDF metadata title differs from visible project/document title · Checked 2026-09-05

Energy Consumption Calculation
Remaining document questions
  • No final Commission outcome, installed count or available contract is established. Check the eventual appeal order and final schedule before treating 433 as a completed or unconditionally permitted project.
  • The fit-out design, operator appointment, works contract and satisfaction of the condition are unknown. Confirm the phasing drawing and eventual appeal outcome.
  • This is a calculation, not measured consumption or an equipment award. Product brands, final approved circuit layout and installation are not established. Confirm the council-approved lighting drawing.

Root inspected the normal public council UI and its 343-entry catalogue, then supplied the exact visible CE-order PDF link. The 116-page scanned order was fetched normally. Selected original-scope, revised-condition and signature pages visually inspected. Other categories and revised energy/engineering drawings remain unassessed; earlier portal access difficulties are superseded by this successful normal UI retrieval. All eight pages of the selected further-information lighting energy calculation were also visually inspected. Its PDF metadata says Volt Drop Calculation, while every visible page correctly names Ballymastone Phase 3 and Energy Consumption Calculation; visible content and exact catalogue identity used.

Source history

Timeline

  1. Planning application received

    LRD0053S3

    Official source

  2. Planning decision

    LRD0053S3

    Permission granted

    Official source

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.