Connected planning records

Planning case 196089

Cork County Council · 196089 · Mitchelstown, Cork

Latest linked evidence

Notified commencement · 2025-10-10

CN0134372CC · The proposed Mitchelstown Biomethane CGI is to be constructed adjacent to the existing Corracunna AGI, accessible through the N73 to Mitchelstown, Co. Cork. This Commencement Notice includes the proposed development of a single Compressor building.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    196089

    Official source

  2. Planning decision

    196089

    Conditional permission

    Official source

  3. Notified commencement

    CN0131153CC

    The proposed Mitchelstown Biomethane CGI is to be constructed adjacent to the existing Corracunna AGI, accessible through the N73 to Mitchelstown, Co. Cork. This Commencement Notice includes the proposed development of the following single storey buildings: • Biomethane Network Entry Facility (BNEF) Kiosk • Electrical and Instrumentation Control Building • Package Boiler Unit (PBU) Kiosk • 2 no. Pressure Reduction Skid (PRS) Decanting Kiosks • Standby Electrical Generator Kiosk • Welfare & Control Building

    Quantity not established for this notice.

    · Notice evidence

  4. Notified commencement

    CN0134372CC

    The proposed Mitchelstown Biomethane CGI is to be constructed adjacent to the existing Corracunna AGI, accessible through the N73 to Mitchelstown, Co. Cork. This Commencement Notice includes the proposed development of a single Compressor building.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.