Connected planning records

Planning case 18911

Kildare County Council · 18911 · Maynooth, Kildare

Latest linked evidence

Notified commencement · 2020-01-30

1) A pitched roof extension to the north-east side consisting of a garage, office and storage loft. 2) A single storey flat roof extension to south-east side consisting of a kitchen/dining area and a roof terrace with external stairs. 3) internal modifications creating 5th bedroom. 4) works incorporating the existing external basement entrance into the house and all associated site works. The proposed development is within the curtilage of Carton House, associated outhouses stables and yards which are protected structures (Ref. No. B06-09). No works are proposed which directly affect these structures.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    18911

  2. Planning decision

    18911

    Conditional permission

  3. Grant date recorded

    18911

  4. Notified commencement

    Commencement notice

    1) A pitched roof extension to the north-east side consisting of a garage, office and storage loft. 2) A single storey flat roof extension to south-east side consisting of a kitchen/dining area and a roof terrace with external stairs. 3) internal modifications creating 5th bedroom. 4) works incorporating the existing external basement entrance into the house and all associated site works. The proposed development is within the curtilage of Carton House, associated outhouses stables and yards which are protected structures (Ref. No. B06-09). No works are proposed which directly affect these structures.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.