Connected planning records

Telecoms, Former G.W Biggs & Co. Site, Bridge Street and Market Lane, Bantry... - Planning Application 26/0979

Cork County Council · 260979 · Cork

Latest linked evidence

Planning decision · 2026-08-19

260979 · Decision recorded

Open official source

Indexed observation: Granted. Read the linked decisions for their full terms.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Reviewed build intelligence

What the documents establish

Government document review

The 19 August notification is a decision to grant, not a final grant. The 105 m² cafe/bar is included in the 691 m² education hub; it is not an additional building area.

2 official documents inspected · Checked 2026-09-07 · Official file index

Council decision covers auditorium, education hub and separate plant building

Decision to grant on 19 August; final grant not established

What the evidence says
The August notification describes a 1,105.5 m² auditorium incorporating a 271-seat hall and ancillary rooms, a 691 m² education hub incorporating the 105 m² cafe/bar, and a separate two-storey plant building. The notice says a later final grant is required before development is authorised.

Why it may matter — interpretation
Performance-space, teaching and building-services packages need their distinct uses and included subareas retained in the project scope.

What is not established
Final grant, a reconciled all-building floor-area schedule, contractor appointment and commencement are not established.

Inspect the evidence

Notification of decision to grant and conditions · p.1
Auditorium 1105.5 m²; education hub 691 m² incorporating cafe/bar 105 m²; later grant required · Issued 2026-08-19 · Order and signed notification 19 August; application amended 23 July · Checked 2026-09-07

Auditorium 1105.5 m²; education hub 691 m² incorporating cafe/bar 105 m²; later grant required

Planning roof design combines metal slopes, lanterns and screened plant

Original WCMC-P-104 revision A; not a construction-issued roof or equipment schedule

What the evidence says
Revision A of the roof plan shows metal-clad sloping roofs matching the facade, metal-clad lanterns, rooflights and metal screens concealing plant. It also identifies the separate external plant room. These are the April planning design details, subject to the July amendments and subsequent decision requirements.

Why it may matter — interpretation
Roofing, facade and mechanical teams need to coordinate the lanterns, daylight openings and plant screening at the detailed-design stage.

What is not established
Final metal specification, structural support, plant selection, equipment capacity and any later roof-detail approval are not established.

Inspect the evidence

Proposed roof plan · p.1
WCMC-P-104 revision A: keys 3, 6, 8, 10 and 19 · Issued 2026-04-10 · WCMC-P-104 revision A, issued for planning 10 April; received 17 April · Checked 2026-09-07

WCMC-P-104 revision A: keys 3, 6, 8, 10 and 19

Notification of decision to grant and conditions · p.1
Application received 17 April as amended 23 July · Issued 2026-08-19 · Order and signed notification 19 August; application amended 23 July · Checked 2026-09-07

Application received 17 April as amended 23 July

Acoustic confirmation and operating-noise testing are required

Acoustic requirements in a council decision; compliance not demonstrated

What the evidence says
Conditions 11 to 13 require acoustic-professional confirmation of the submitted noise assessment recommendations before development, a construction noise and vibration plan, and a noise survey within three months of operations. At noise-sensitive locations the notification sets 55 dBA daytime, 50 dBA evening and 45 dBA night limits, with the document specifying different averaging measures.

Why it may matter — interpretation
Acoustic consultants and performance-space and mechanical designers need the envelope, plant and operating regime coordinated against the stated limits.

What is not established
Final acoustic report, compliance approval, installed sound insulation and operating-noise survey are not established.

Inspect the evidence

Notification of decision to grant and conditions · p.6
Conditions 11 to 13: acoustic report, operating limits and monitoring · Issued 2026-08-19 · Order and signed notification 19 August; application amended 23 July · Checked 2026-09-07

Conditions 11 to 13: acoustic report, operating limits and monitoring

Invasive-species clearance is a pre-construction dependency

Enabling requirement recorded in the August decision

What the evidence says
Condition 10 requires an agreed final invasive-species management plan, specialist treatment or removal of Japanese knotweed and giant rhubarb, and specialist certification that the site is free from contamination before construction. The condition also addresses licensing for removal of these species or affected soil.

Why it may matter — interpretation
Groundworks, demolition and ecology teams should establish the agreed treatment and soil-handling sequence before mobilisation.

What is not established
Approved final management plan, licensing, specialist certification and completed clearance are not established.

Inspect the evidence

Notification of decision to grant and conditions · p.6
Condition 10: invasive-species plan and certification before construction · Issued 2026-08-19 · Order and signed notification 19 August; application amended 23 July · Checked 2026-09-07

Condition 10: invasive-species plan and certification before construction
Remaining document questions
  • Has final permission issued, and have acoustic, invasive-species and detailed roof/plant requirements been agreed?

The declared pages of these government-published PDFs were visually inspected. Other catalogue files, later compliance, procurement and installed specifications were not established. Historical weekly membership is retained separately from these document dates.

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.