Connected planning records

Planning case F26A0237

Fingal County Council · F26A0237 · Dublin, Dublin

Latest linked evidence

Notified commencement · 2026-08-04

1) a single storey extension to the front / side / rear, 2) internal alterations throughout the ground floor with the removal of one bay window to the rear to be replaced with a sliding door, and increasing the size of the remaining 2 bay windows to the rear, 3) internal alterations to the first floor level to combine 2 bedrooms into one master bedroom with alterations to the dormer window layout removing one window and re-cladding the dormer in zinc roof finishes, with all associated site works

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    F26A0237

    Official source

  2. Planning decision

    F26A0237

    Permission granted

    Official source

  3. Grant date recorded

    F26A0237

    Official source

  4. Notified commencement

    Commencement notice

    1) a single storey extension to the front / side / rear, 2) internal alterations throughout the ground floor with the removal of one bay window to the rear to be replaced with a sliding door, and increasing the size of the remaining 2 bay windows to the rear, 3) internal alterations to the first floor level to combine 2 bedrooms into one master bedroom with alterations to the dormer window layout removing one window and re-cladding the dormer in zinc roof finishes, with all associated site works

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.