Notified commencement · 2025-02-20
• Removing 1980’s staircase from Rere Basement to Rere Hall Floor Return. • Removing 1980’s plasterboard partitions separating the Lobby, Staircase and Rere Return Office in the Basement Return. • Removing six number 1980’s single-glazed, top-hung, outward opening windows in the Rere Hall Floor and Basement Return. • Installation of new timber floor at Hall Floor Return level. • Installation of new partitions at Rere Basement Return level to form a Lobby/Tea Station and Rere Office. • Installation of two number new Bathrooms at Rere Hall Floor Return Access. • Supply and fit of six number new side-hung, timber casement, outward opening windows. • Supply and fit glazed fire door at Hall Floor Rere Hall. • Fitting new floorcovering throughout. • Decoration throughout.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.