Latest linked evidence
Notified commencement · 2025-11-26
The proposed redevelopment, conservation, refurbishment and change of use of no.s 31, 32 and 33 South Terrace, Cork including the construction of a new 5 floor over the ground floor and lower ground floor annex to the rear of the Protected structures. The annex will be connected to the existing buildings by means of a glazed link at ground floor level. The development consists of the construction of a 103-no. bedroom aparthotel and all ancillary site development works.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.