Latest linked evidence
Notified commencement · 2020-07-06
1. Demolition of existing utility roof at lower ground floor, external stairs at lower ground floor level front façade and coal bunker roof front façade. 2. Part demolition of kitchen wall ground floor, kitchen wall lower ground floor, family room wall, windows to front façade lower ground floor and lower ground floor utility wall. 3. Extension lower ground floor rear 2.25 sqm and ground floor level rear 3.3 sqm. 4. Re-construction of existing stairs rear garden level, mono-pitched roof and rear garden terrace 7.5 sqm. 5. New external wall north elevation rear garden, window ground floor level rear façade, garden level external storage 20.8 sqm, side entrance ground floor, railings, granite steps to side entrance and 4 roof lights to central valley of existing roof. 6. Internal alterations and refurbishment and site works including proposed new connection for foul drainage to existing public mains.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.