Planning case SD1780005

South Dublin County Council · SD1780005 · Lucan, Dublin

Latest linked evidence

Notified commencement · 2019-07-12

The new Lucan public swimming pool building will have a 25 metre long, 6 lane, 13 metre wide pool, as well as a 13 metre long, 8 metre wide, multiuse pool with a moveable floor. The new facility will also include a gymnasium and fitness suites, changing facilities and cafeteria and associated accommodation. Landscaping and Public Realm improvements to surrounding area and new car park to allow for 107 car parking spaces including 6 no. accessible parking spaces and 78 Bicycle parking spaces. Construction will be brick and block cavity wall construction with steel frame elements and lightweight roofs; high performance curtain wall glazing and high level cast channel glazing. The new pool will be a nearly zero –energy building (Directive 2010/31/EU on the Energy Performance of Buildings. Choice and specification of materials will be based on life cycle assessment. High efficiency and renewable systems will be included in the design of the building. Excellent indoor air quality, optimising natural light, ensuring comfortable working temperatures and adequate ventilation have all been important considerations of the design.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    SD1780005

    Official source

  2. Planning decision

    SD1780005

    Decision recorded

    Official source

  3. Notified commencement

    Commencement notice

    The new Lucan public swimming pool building will have a 25 metre long, 6 lane, 13 metre wide pool, as well as a 13 metre long, 8 metre wide, multiuse pool with a moveable floor. The new facility will also include a gymnasium and fitness suites, changing facilities and cafeteria and associated accommodation. Landscaping and Public Realm improvements to surrounding area and new car park to allow for 107 car parking spaces including 6 no. accessible parking spaces and 78 Bicycle parking spaces. Construction will be brick and block cavity wall construction with steel frame elements and lightweight roofs; high performance curtain wall glazing and high level cast channel glazing. The new pool will be a nearly zero –energy building (Directive 2010/31/EU on the Energy Performance of Buildings. Choice and specification of materials will be based on life cycle assessment. High efficiency and renewable systems will be included in the design of the building. Excellent indoor air quality, optimising natural light, ensuring comfortable working temperatures and adequate ventilation have all been important considerations of the design.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.