Notified commencement · 2025-05-27
Proposed construction of a single storey extension to the north side of the existing dwelling, demolition of the exisitng single storey bathroom to the rear of the existing dwelling. Decommissioning of the existing conventional septic tank and percolation area as located on the submitted site layout plan to be replaced with a new septic tank system and percolation area as per the requirements of the EPA and local authority recommendations inclusive of all ancillary site works