Save to pipeline
Connected planning records

Planning case D21B0050

Dun Laoghaire Rathdown County Council · D21B0050 · Dublin, Dublin

Latest linked evidence

Notified commencement · 2026-01-16

Internal material alterations to create a habitable loft room (~30 sqm). Works include the completion of structural floor reinforcement, installation of dormer windows, and the provision of a fire escape landing (or compliant fire escape window) to the front gable. Internal works include the upgrade of a protected stairway and installation of a fire detection and alarm system consisting of interconnected mains-powered multi-sensor units in all habitable rooms and circulation areas in accordance with I.S. 3218 and TGD Part B.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D21B0050

  2. Planning decision

    D21B0050

    Permission granted

  3. Grant date recorded

    D21B0050

  4. Notified commencement

    Commencement notice

    Internal material alterations to create a habitable loft room (~30 sqm). Works include the completion of structural floor reinforcement, installation of dormer windows, and the provision of a fire escape landing (or compliant fire escape window) to the front gable. Internal works include the upgrade of a protected stairway and installation of a fire detection and alarm system consisting of interconnected mains-powered multi-sensor units in all habitable rooms and circulation areas in accordance with I.S. 3218 and TGD Part B.

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.