Connected planning records

Planning case D16A0038

Dun Laoghaire Rathdown County Council · D16A0038 · Rathfarnham, Dublin

Latest linked evidence

Notified commencement · 2016-06-03

The proposed development consists of an extension and alterations to an existing building, the science block, in the curtilage of a protected structure (RPS No 1655) on the campus of St. Columbas College which includes; the construction of 1 no. new laboratory, store room and boiler room (c. 72.6 sqm) in the undercroft of the existing building; repair and refurbishment of existing science block to include façade, glazing and upgrades to improve thermal performance; alterations to North, South, east and West elevations; alterations to ground and first floor layouts and associated site works.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D16A0038

  2. Planning decision

    D16A0038

    Permission granted

  3. Grant date recorded

    D16A0038

  4. Notified commencement

    Commencement notice

    The proposed development consists of an extension and alterations to an existing building, the science block, in the curtilage of a protected structure (RPS No 1655) on the campus of St. Columbas College which includes; the construction of 1 no. new laboratory, store room and boiler room (c. 72.6 sqm) in the undercroft of the existing building; repair and refurbishment of existing science block to include façade, glazing and upgrades to improve thermal performance; alterations to North, South, east and West elevations; alterations to ground and first floor layouts and associated site works.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.