Latest planning applications.

319 applications belong to this reporting edition across 22 counties. The retained records support 287 units and 262 direct official links; received dates remain visible separately because membership follows the producer's declared edition field.

20–26 Jul 2026 ReportingWeek319 applications262 official links22 counties287 record-supported units

Largest applications this week

By notice / record units

All applications in this snapshot

8 matching records

Clare, Claremorris, Co Mayo

MayoMayo County Council2660392

THE DEVELOPMENT CONSISTS OF THE RETENTION OF REVISED SITE BOUNDARIES FOR THE EXISTING HOUSE AND BASEMENT AS GRANTED UNDER P04/3227

Published/ETL 22 Jul 2026Received 19 May 2026Decision date 6 Jul 2026CONDITIONAL

Carrowgowan, Bohola, Mayo

MayoMayo County Council2660370

The Proposed Replacement Of An Existing Septic Tank System With An Onsite Sewerage System With Polishing Filter In Accordance With EPA Code of Practice 2021 To Service An Existing Dormer Type Dwelling House And All Ancillary Works

Published/ETL 22 Jul 2026Received 12 May 2026Decision date 6 Jul 2026CONDITIONAL

Thomas Street, Kiltimagh, Co Mayo

MayoMayo County Council25520

change of use of existing premises formally a public house to afterschool service facilities along with ancillary works

Published/ETL 22 Jul 2026Received 19 Dec 2025Decision date 6 Jul 2026CONDITIONAL

Barcastle Retail Park, Gorteendrunnagh, Castlebar Co Mayo

MayoMayo County Council2660376

Change of use from retail showroom to Coffee Shop within curtilage of existing building along with new signage and alterations

Published/ETL 22 Jul 2026Received 13 May 2026Decision date 6 Jul 2026CONDITIONAL

Knockavrony, Ballyvary, Co. Mayo

MayoMayo County Council2660273

The development will consist of the renovation of an existing dwelling and the construction of a single storey extension, along with any associated site development works.

Published/ETL 22 Jul 2026Received 8 Apr 2026Decision date 6 Jul 2026CONDITIONAL

Carrowgowan, Bohola, Mayo

MayoMayo County Council2660371

The Proposed Replacement Of An Existing Septic Tank System With An Onsite Sewerage System With Polishing Filter In Accordance With EPA Code of Practice 2021 To Service An Existing Dormer Type Dwelling House And All Ancillary Works

Published/ETL 22 Jul 2026Received 12 May 2026Decision date 6 Jul 2026CONDITIONAL

Cludaune Road, Belderrig Beg, Balina

MayoMayo County Council26105

conversion of existing workshop, turf shed and storage facilites to domestic 2 bedroom accommodation and also include new septic tank facilites and ancillary site works

Published/ETL 21 Jul 2026Received 12 May 2026Decision date 3 Jul 2026CONDITIONAL

McDermott St., Ballina, Co. Mayo

MayoMayo County Council2660126

Ballina Convent is a protected structure. 1. Change of use of the convent ground floor to community facilities @ 1036 sqm and two-bedroom apartment @ 103 sqm. The proposed community facilities include continued use of the existing chapel for religious purposes, continued use of kitchen areas and dining/meeting room. Other proposed community facilities will include counselling and therapy functions, meeting rooms, training rooms, music and art facilities, sanitary facilities and community courtyard. The proposed apartment will be used by residents associated with the functioning of the community facilities. The works will include new mechanical, electrical and drainage services throughout and photovoltaic panels at convent flat roof and some pitched roofs. The works will include various conservation related works to the historical internal and external fabric of the convent. 2. New single storey steel shed for carpentry workshops and storage @ 203 sqm; 3. Change of use to community facilities of St. Marys unused school building @ 462 sqm, and external insulation and photovoltaic panels. 4. Change of use to community facilities of St. Annes unused school building @ 795 sqm, and external insulation and photovoltaic panels. 5. Re instatement of the existing gatehouse as a residential building, including refurbishment works and two-bedroomed extension, photovoltaic panels and new parking area and storage shed with new road access from the convent site access road. The gatehouse will be used by residents associated with the functioning of the community facilities. 6. New steel palisade fencing and cast-iron heritage type fencing at parts of site. 7. New car parking layouts to the main site. 8. New fuel tank. 9. All associated site works. 10. Directional signposting on site and signage at entrance gates area.

Published/ETL 21 Jul 2026Received 16 Feb 2026Decision date 3 Jul 2026CONDITIONAL
How this is counted

The five-column module ranks positive record-supported unit values only; floor-only applications are not mixed into that ranking. Inclusion is the retained planning-publication membership, while received dates remain separate. This page reads the frozen weekly snapshot for 20–26 Jul 2026 and performs no visitor-time fetch.