Latest planning applications.
925 recorded by 19 Sep 2026 · Later council validations are not added.
925 planning applications were published this week across 26 counties. Together they state 1,092 units, and 925 link to the council's own file. Each shows the date it was received.
Largest applications this week
By units statedAll applications this week
29 recordsLisquilibeen, Coolbawn, Nenagh, Co. Tipperary, E45 F447
the erection of a garage, including associated works
Foilduff, Rearcross, Co. Tipperary, V94 P044
the demolition of existing store shed and hayshed and the construction of cubicle shed with calving pens, calf housing and loose animal area along with underground slurry store and all ancillary works and facilities
Glebe Lane, Kenyon Street, Nenagh, Co. Tipperary, E45 T956
amendments to the previously approved planning permission (Reference: 24/60989) consisting of internal alterations resulting in a total of 11 no. apartments (6 no. 1-Bedrom apartments and 5 no. Studio apartments) in a four-storey block with balconies, bin storage, bike storage and all associated site development works on the site of the existing warehouse
No 5 Ard Coillte, Ballina, Co Tipperary
construct an extension to the side of our house, linking the house and domestic garage and converting the garage to living accommodation
Fort Henry Business Park, Ballina, Co Tipperary, V94FF1P
(i) Works to the existing manufacturing production and administration building to include: (a) Construction of an extension building between the existing production and administration building and the existing warehouse building with associated ramp access, to provide for increased production and store space; (b) Provision of seven modular store units linked to; the existing production and administration building; and, the proposed extension for use ancillary to manufacturing activity; (c) Construction of goods lift to rear of the existing production and administration building; (d) Minor alterations to the existing car park layout to facilitate the proposed extension building; (ii) Works to the existing light industrial building (‘Unit 2’) to provide for; (a) extension to the rear of the building to provide for increased storage; and (b) modifications to north-west and south-west elevations of that building to provide for the replacement of roller door and pedestrian door openings; (iii) Provision of additional plant area with perimeter fencing; (iv) Provision of new surface water management infrastructure including collection of roof water and provision of on-site surface water storage with controlled discharge from that new storage to an existing surface water outfall via a proposed new headwall outlet; (v) Provision of new pedestrian gate access along roadside boundary; (vi) Proposed lighting within the site; and (vii) All associated site development works including the removal of existing temporary modular structures from the site; and 2. Retention Permission for the following works: (a) Erection of three flag poles at the entrance; and (b) Externally affixed signage on existing buildings
Boytonrath, Cashel, Co. Tipperary
an agricultural entrance and for minor alterations to existing domestic entrance and associated works on lands
Brick, Grange, Clonmel, E91 HF98
construction of a domestic garage and all associated site development works
Clooncleagh, Two Mile Borris, Thurles, Co. Tipperary, E41FF83
1. a bovine shed with a slatted concrete slurry storage tank. 2. Permission for a machinery store. with all developments to include appropriate site works
Ballynilard, Tipperary, Co. Tipperary
RED III application for development which comprises the construction of an anaerobic digestion facility to produce renewable biomethane, and a bio-based fertiliser from organic material. The total gross floor area of the proposed development (including internal plant areas and ancillary structures) will be c. 3,301 sq.m. The development is a renewable energy development which is covered by the provisions of the Renewable Energy Directive III. The development will consist of the following: • Construction of 3 no. digesters (all c. 15.5m in height), 2 no. digestate storage structures (c. 15.5m and c. 12m in height), and a pump room and O2 generation structure (with a GFA of c. 27 sq.m. and a height of c. 2.6m), located in the northern section of the main site area. • 4 no. pasteurisation tanks (each c. 6m in height), a post pasteurisation cooling tank (c. 4m in height), and a pre fertiliser manufacturing tank (c. 4m in height), located to the southeast of the main digesters. • A liquid feed tank (c. 4m in height), a pump house (with a height of c. 2.6m and GFA of 14 sq.m), and a pump skid (c. 0.8m in height), located to the southwest of the main digesters. • A part single-storey and part two-storey reception hall (with a gross floor area (GFA) of c. 1,964 sq.m. and an overall height of c. 16.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located in the central portion of the site. • A single-storey solid digestate storage and a nutrient recovery building (with a GFA of c. 880 sq.m and an overall height of c. 12.4m) located to the east of the reception hall, in the central portion of the site. • A pump house (with a height of c. 2.6m and GFA of 21 sq.m), a fuel storage tank (c. 1.6m in height), and a backup generator (c. 2.3m in height), located adjacent to the nutrient recovery building. • Odour abatement plant (with an overall height of c. 7m) and equipment and a digestate offtake area will be provided to the east of the solid digestate storage and nutrient recovery building. • construction of an emergency biogas flare (c. 11.3m in height), 2 no. biogas treatment skids (with an overall height of c. 4.1m), 2 no. biogas compression structures (with a height of c. 2.6m), a biogas upgrading module (with a maximum height of c. 4.6m and a GFA of c. 28 sq.m), a combined heat and power unit and panel room (with a height of c. 10m to top of flue), a biomethane boiler (c. 5.6m in height to flue stack), and 2 no. propane tanks (c. 1.3m in height), located to within the western section of the site. • Construction of an ESB substation (with a GFA of c. 27 sq.m and a height of c. 3.4m), a grid injection unit (with a GFA of c. 22 sq.m and a height of c. 2.8m) (which will be connected to the gas grid by way of an underground connection by Gas Networks Ireland), a GNI / grid offtake skid, and a fire water storage tank (with a height of c. 7.7m) in the southern portion of the site. • Construction of a two-storey office and administration building (with an overall height of c. 8.7m and a GFA of c. 305 sq.m), located within the southeastern section of the site. • Associated works including parking (6 no. standard, 2 no. EV, and 1 no. accessible parking spaces; and bike storage), access arrangements (including new access and entrance road to the site from the adjacent road to the south, with setting back of boundaries along the R662), a weighbridge, provision of solar panels (roofed mounted solar arrays), wastewater treatment equipment, attenuation pond in the northern portion of the site and associated surface water outfall to the north of the main site area, boundary treatments, lighting, services, lightning protection masts, drainage, landscaping, and all associated and ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) accompanies the planning application An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development
Main Street, Ballina, Co. Tipperary, V94TD71
alterations to the number, location and sizes of windows and doors from that permitted and extension of premises to rear boundary and all associated site works
Birdhill Service Area, Junction 7 (M7), Lacken, Birdhill, Co. Tipperary, V94 720P
proposed development which will consist of: • expansion of the existing service station to accommodate a new HGV and coach parking area, vegetated infiltration basin and dog walking trail, • reconfiguration of the existing parking area to provide additional staff and customer car parking, • new extended canopy and provision of 3 new pumps islands. Also, ancillary works including: • part of canopy and pump under to be removed, • relocation of HVO tank and container, • landscaped areas, • new internal road and paths, • all associated site works
Graigue Lower, Killenaule, Thurles, Co. Tipperary
construction of a single storey dwelling, detached single storey garage, septic tank and percolation area, connection to public water, new site entrance and all associated site works
21 O'Brien Street, Tipperary Town, Co. Tipperary, E34CX94
renovations to dwelling including retention of new roof with 5 No. velux lights to the rear of the dwelling, closing of window opening on second floor, conversion of rear ground floor window to patio doors, removal of 2 No. Chimneys, removal of side gates with concrete lintel overhead, removal of car port canopy over side gates, concrete apron around side and back of the dwelling, replacement of windows and doors and associated site works
Outrath, Cahir, Co. Tipperary
construction of renovations & extensions to existing house including the provision of a new waste water treatment system & garage with all associated site works
80 Ard Na Greine, Clonmel, Co. Tipperary
construction of a vehicular entrance and car-parking area at the front of my house, including all associated site development works
Fort Henry Business Park, Ballina, Co Tipperary, V94FF1P
the construction of an overflow car park with associated lighting and all associated works serving the existing manufacturing facility
Knockballiniry Td, Ardfinnan, Co Tipperary
construction of glamping area with 3 no. glamping pods, to construct an amenity area including shower room and drying area attached to existing agricultural building, 3 no. parking spaces, bicycle parking, revised entrance, effluent treatment system with raised bed tertiary filter and associated site works
Rathmoy, Borrisoleigh, Thurles, Co. Tipperary
a two storey dwelling with associated detached garage, opening of a new vehicular entrance to the site and wastewater treatment system and soil polishing filter together with all associated site development works
19-20 Irishtown, Clonmel, Co. Tipperary
change the use of the ground floor to gaming centre including all associated site works such as storage and signage
Gaile, Thurles, Co Tipperary
a single storey domestic garage and all associated site works
Reddans Walk, Greenane, Co. Tipperary
repair works, part-demolitions, alterations and extensions to the existing singlestorey dwelling house, installation of a new onsite wastewater treatment system, repairs and alterations of a driveway and entrance together with all associated ancillary development works
Belview, Rathmartin Rd, Nenagh, Co.Tipperary, E45V128
a garage and a storage shed
Ballydavid, Bansha, Co. Tipperary, E34 T974
(i) metal sheeted roof in place of original slate roof; (ii) relocation of original entrance to L3102; (iii) additional window to front elevation; (iv) reconstructed wall to Western site boundary; (v) storage shed to rear of dwelling; (vi) concrete post and composite panel fencing to pre-existing entrance to the minor local road and also (vii) the dome structure located to the rear of the dwelling along with the modified entrance and access laneway to same
Carrigatogher Abbott, Nenagh, Co. Tipperary
reference 2461095 for the construction of a dwelling, storage shed, waste water system and entrance
19-20 Irishtown, Clonmel, Co. Tipperary
change the use of the ground floor to gaming centre including all associated site works such as storage and signage
Killawardy, Killea, Templemore, Co. Tipperary, E41HN88
existing domestic sheds including associated siteworks
An Bunnán Bui, Ballinahinch and Rossfinch, Birdhill, Co Tipperary
a commercial store
Rathvin, Fethard, Co. Tipperary
construction of a single storey farm storage building adjoining existing stables building and all associated site works
Rossadrehid, Co. Tipperary, E34 YP80
the construction of an existing extension and timber store to an existing dwelling and all associated site development works
How this is counted
The largest applications are ranked by the units each one states; applications that state only a floor area are not ranked with them. An application belongs to the week it was published; the date it was received is shown separately. Figures cover 7–13 Sep 2026.