Refusal decisions · 14–20 Sep 2026
The refusal total is final. 60 evidence-complete decision cards are available below.
What this means
Applications were most often refused because the proposal did not fit its site or surroundings, conflicted with zoning or rural-housing policy, lacked enough technical evidence to demonstrate its impacts were acceptable, harmed the amenity of neighbouring homes or created access or road-safety problems.
60 of 80 records carry official reason text
132 published statements, 2.2 per analysed application
31 refused on more than one ground, up to 7
Most common pairs
- 23 Design + Missing evidence
- 23 Design + Zoning/policy
- 19 Design + Residential amenity
All ten refusal themes
Applications · statements- 01 Design, scale, character or visual impact 42
- 02 Zoning, land use, settlement policy or rural housing need 31
- 03 Missing or insufficient evidence, surveys or technical detail 26
- 04 Residential amenity, privacy, light or noise 23
- 05 Traffic, access, parking or road safety 21
- 06 Unauthorised development, retention or procedural history 17
- 07 Ecology, habitats or Natura impacts 15
- 08 Wastewater, effluent, groundwater or public health 15
- 09 Surface-water drainage or flood risk 13
- 10 Built heritage or archaeology 9
Refusal decisions · 14–20 Sep 2026
0 of 0 cards shown · 60 case links · 3 linked projects
The figures at the top of this page are for all of Ireland; this list shows Sligo only.
The verified refusal total remains shown above.