Latest planning applications.
657 so far · Updated 27 Oct 2026. More may be added before the count is final.
657 planning applications were published this week across 26 counties. Together they state 1,707 units, and 657 link to the council's own file. Each shows the date it was received.
Largest applications this week
By units statedAll applications this week
13 recordsBallyclare, Ferbane, Co. Offaly
construction of a dwelling house and domestic garage, to include a septic tank and percolation area, proposed connection to mains water supply, new site entrance and all associated site works
Newtown, Lusmagh, Banagher
the completion of an existing partially completed dwelling house, the construction of a new domestic garage, a wastewater treatment system with raised percolation area, works to existing site entrance and all other associated site works
Glebe, Shinrone, Birr, Co, Offaly
a new dwelling, site entrance, driveway, septic tank, percolation area and all associated site works.
Tinacrannagh, Droughill, Portarlington, Co. Offaly
proposed slatted shed and all associated site works
Ballycumber GAA Club, Moorock, Ballycumber, Co. Offaly, R35 T1H5
the installation of 17 no. new external lights and all associated site works, to serve the existing walking track. Retention Permission for 7 no. existing external lights
Clonin, Coolcor, Rhode, Co. Offaly
the provision of a 110kV AIS substation at Clonin, Coolcor, Rhode, Co. Offaly. The proposed development will extend the existing Derryiron 110kV transmission node. The proposed development includes the following: (i) EirGrid compound comprising EirGrid control building and external Air Insulated Switchgear (AIS), (ii) Independent Power Producer (IPP) compound, adjoining the north-western area of the proposed substation, comprising IPP control building, external grid transformer and AIS, and an underground electrical connection to the energy storage development permitted under planning application Ref. 2460289, (iii) underground 110kV electrical connection from the proposed substation to the existing Derryiron 110kV transmission node, including cabling in the public road (L10093-2), (iv) underground 110kV electrical connection from the proposed substation to underground transmission cable in the public road (L10093-2) consented under ABP-309491-21, (v) new vehicular access road (“spine road”) connecting to the RGEP road network, providing access to the proposed 110kV substation, revised access arrangements to the development permitted under planning application Ref. 2460289, and planning application Ref. 20238, (vi) new foul sewer line, serving the proposed 110kV substation and the development permitted under planning applications Ref. 2460289 and Ref. 20238, discharging to the existing local public network, (vii) removal of existing disused medium voltage substation and ancillary items, and (viii) all associated civil engineering and electrical engineering works, including underground electrical cables and ducting, temporary construction compound, surface water and foul water drainage, landscaping, lighting and security fencing
Millbrook House, Military Road, Birr, Co. Offaly, R42 DK80
The Change Of Use Of The Ground Floor Section Of The Existing Coach House To Domestic Use To Form An Ancillary, Self-Contained Family Accommodation Unit Integrated With The First Floor (Which Was Previously Approved For Domestic Use Under Planning Ref: Br1248).Retention Is Also Sought For The Site Layout As Constructed, Including The Omission Of The Connecting Corridor To The Existing Main House That Was Originally Permitted Under Planning Ref: Br1248, And All Associated Site Works. The Development Is Located Within A Protected Structure (Offaly Record Of Protected Structure Ref: 53-371)
Killeenboy, Cloghan, Co. Offaly
construction of a dwelling house and domestic garage, to include a septic tank and percolation area, proposed connection to mains water supply, new site entrance and all associated site works
Collins Lane, Tullamore, Co Offaly
We, Collins Lane Housing Development Limited intend to apply for permission for development on lands at Collins Lane, Tullamore, Co. Offaly. It is proposed to modify the planning grant at Collins Lane (ref. 26/60013) as follows: To comply with Building Regulations we propose to introduce a second staircase core to serve the 1st-floor apartments. Other minor changes we propose, the site position (now realigned to Estate Road 1), revised building footprint GIA update: from 1045.5 m² to 1056.9m2, internal layout area adjustments to both the crèche unit and the apartments and updated external elevations. A minor reduction in the outdoor play area from 420 sqm to 401 sqm although still under the required guidelines. The number of residential apartments, crèche child capacity, and required car/cycle parking spaces remain completely unchanged from the original application. The Planning application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.
Ballyclare, Ferbane, Co. Offaly
construction of a dwelling house and domestic garage, to include a septic tank and percolation area, proposed connection to mains water supply, new site entrance and all associated site works
Down, Geashill, Co. Offaly
construction (i) Slatted shed (ii) walled silage slab (iii) Storage shed and all associated site works
Downshire Road and Downshire Drive, Edenderry, Co. Offaly.
Application for full planning permission for change of use of existing 14No. disused substantially completed commercial units to use as 3No. 2 bedroom residential units and 11No. 1 bedroom residential units, with external private open space enclosures, and all associated site works on the corner of Downshire Road and Downshire Drive, Edenderry, Co. Offaly. (Previous Planning Ref. 20/314).
Derryarkin, Rhode, Co. Offaly, R35 X397
The development will consist of the demolition of existing agricultural sheds and structures on-site and the construction and operation of a Materials Recovery Facility (MRF) for the acceptance and processing of up to 90,000 tonnes per annum of household, commercial and industrial (C&I), and construction and demolition (C&D) waste. Elements of the proposed development include the following. (1) The demolition of all existing agricultural sheds and structures on-site (which cover an area of 1,417 m2). (2) The construction and operation of a Materials Recovery Facility, comprising: (a) a site entrance; (b) a weighbridge; (c) truck set down and parking areas; (d) staff parking, comprising 24 parking spaces including disabled parking and electric vehicle (EV) charging; (e) a concrete yard area; (f) a fuel storage area, consisting of a diesel tank and a raised bund wall; (g) external waste storage bays; (h) skip/bin storage areas; (i) a perimeter boundary wall (4 m in height) and perimeter fencing (2.1 m in height), with a hawthorn hedgerow maintained at a height of 4.5 to 5 m and width of 1.5 to 2 m along the southern perimeter of the site; (j) an overground firewater storage tank (5.5 m in diameter and 3.8 m in height, with a maximum capacity of 78 m³); (k) a two-storey Administration Building (7.35 m in height, with an overall floor area of 396 m²); (l) a single storey MRF building (13 m in height, with an overall floor area of ca. 2,850 m² to a maximum height of 13 m), which will include waste storage and processing areas and a separate workshop area; (m) a below grade truck loading bay situated within the MRF building; (n) an on-site ESB sub-station and adjoining electrical room (2.175 m in height, with a combined floor area of 61 m²); (o) solar panels (covering a total area of 737 m²) mounted atop the proposed Administration and MRF building roofs; (p) an on-site wastewater treatment system (for wastewater generated at sanitary facilities in the Administration Building), including an associated percolation area and ancillary services; (q) a dedicated drainage system for managing uncontaminated stormwater generated on roof and non-process yard areas on-site, which will include a Continuous Water Quality Monitoring System, an underground stormwater attenuation tank (436.8 m³ in size), a Class 1 By-Pass Separator, a proposed slam shut valve (which can be triggered automatically), a hydrobrake and a proposed manhole gate valve; and (r) a separate, dedicat
How this is counted
The largest applications are ranked by the units each one states; applications that state only a floor area are not ranked with them. An application belongs to the week it was published; the date it was received is shown separately. Figures cover 19–25 Oct 2026.