Latest planning applications.

657 so far · Updated 27 Oct 2026. More may be added before the count is final.

657 planning applications were published this week across 26 counties. Together they state 1,707 units, and 657 link to the council's own file. Each shows the date it was received.

19–25 Oct 2026 Week657 applications657 link to the council file26 counties1,707 units stated

Largest applications this week

By units stated

All applications this week

3 records

Formoyle, Calry, Co. Sligo

SligoSligo County Council2660438

Stephen McNasser intends to apply for permission for development at Formoyle, Calry, Co. Sligo. The development will consist of the following: 1. Construction of a detached four-bedroom, single storey dwelling 2. Construction of a detached garage 3. Construction of a new wastewater treatment system and percolation area in accordance with EPA Code of Practice 4. Construction of a new site access including construction of access road and driveway 5. New connection to public watermain 6. All associated site development works

Received 23 Oct 2026Received 23 Oct 20261 units (record)

AbbVie Ireland NL B.V., Manorhamilton Rd, Barroe, Co Sligo., F91 XH39

SligoSligo County Council2660437

The construction of a new single-story extension to the south of the existing B-40 building with associated of the existing facility, with a floor area of circa 114 sq metres, with an overall height of 6.5 metres, and all associated site services.

Received 20 Oct 2026Received 20 Oct 2026114 sq m

Hazelwood Road, Hazelwood Demesne, Sligo

SligoSligo County Council2660436

Golden Hill Developments Ltd. intends to apply for permission for development of a residential development of 99 no. dwellings, a childcare facility and two GAA playing pitches and clubhouse facility on a site to the south of the Hazelwood Road (R286), Hazelwood Demesne, Sligo, County Sligo. The proposed development will consist of the following: the demolition of the existing agricultural structures on site (276.8 sq.m); the construction of 99 no. residential dwellings consisting of 10 no. one bedroom duplex units, 20 no. two bedroom house units, 50 no. three bedroom house units, 7 no. four bedroom house units, and 12 no. five bedroom house units; the provision of 168 no. car parking spaces and 50 no. bicycle spaces for the residential units; the construction of a standalone childcare facility (455 sq.m) with 12 no. designated staff parking spaces and 6 no. drop off spaces; the provision of 3,072 sq.m of public open space and 61 sq.m of communal open space; two GAA playing pitches on an area of 1.895 ha to the west and south-west of the residential development; a two storey Clubhouse (522 sq.m) with a car parking area providing for 2 no. temporary bus spaces, 36 no. car parking spaces and 6 no. accessible spaces, associated with the GAA Pitches; the provision of a new entrance onto the R286 Hazelwood Road for vehicular, pedestrian and cycling access; the provision of a new pedestrian footpath and cycle lane (88m) along the R286 Hazelwood Road and a pedestrian crossing; and all associated and ancillary infrastructure (including surface water and foul water drainage and water supply), bin storage, internal streets, cycle parking, public lighting, landscaping, boundary treatments and development works, all on a site of 8.66 ha.

Received 19 Oct 2026Received 19 Oct 202699 units (record) · 1,254 sq m
How this is counted