Latest planning applications.
774 recorded by 8 Nov 2026 · Later council validations are not added.
774 planning applications were published this week across 26 counties. Together they state 5,434 units, and 774 link to the council's own file. Each shows the date it was received.
Largest applications this week
By units statedAll applications this week
22 recordsThe figures at the top of this page are for all of Ireland; this list shows Clare only.
Kilrush Road, Kildysart, Co. Clare
to RETAIN as constructed domestic garage in revised location and revised rear boundary all as a variation to previously granted permission P24-245, plus all ancillary site works at the above address
Ahasla, Maurices Mills, Ennistymon, Co. Clare
to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works, at above address
Site 5, Holland Street, Liscannor Townland, Liscannor, Co. Clare
for change of house style previously granted under Planning Ref. 2460399
The Glen School, Lackareagh Beg, Killaloe, Co. Clare
permission for a new first-floor external balcony with stairs to ground level and for the change of use from residential to short term let for the 72m2 first floor of the outbuilding and retention for change of use from residential to short term let for the 72m2 ground floor of the outbuilding to the rear of The Glen School
Station Road, Ennis, Co. Clare
to carry out development which will consist of the following: (i) Demolition of the existing dwelling / former guest house on the site. (ii) Construction of a new emergency accommodation building, part three-storey and part two-storey in height, providing temporary accommodation and associated support facilities. (iii) Provision of a new boundary wall, landscaping works, and a children's play area. (iv) Connections to existing site services and all sssociated ancillary site development and enabling works. In accordance with the Habitats Directive and the provisions of Article 250 of the Planning and Development Regulations 2001 (as amended), Appropriate Assessment Screening of the proposed development has been carried out to assess, in view of best scientific knowledge, if the development, individually or in combination with other plans or projects, would be likely to have a significant effect on a European site. It has been detrmined that an Appropriate Assessment is not required in respect of this proposed development. An Environmental Impact Assessment (EIA) screening determination has been made. It has been determined that there is no real likelihood of significant effects on the environment arising from the proposed development and concluded that an Environmental impact Assessment is not required.
Derrynalicka, Kilmurry McMahon, Co. Clare, V15 PH67
for (a) RETENTION permission for the demolition and reconstruction of the existing cottage and extension as constructed to date, including elevational changes permitted under Planning Reg. Ref. 23/60274; and (b) PERMISSION to continue and complete the development together with all associated ancillary site works
Gaurus, Cappagh Lawn, Ennis, Co. Clare
to carry out the following development, the construction of an accessible home consisting of: (i) Demolition of existing side and rear extensions. (ii) Construction of new side and rear extensions, and refurbishment of existing bungalow. (iii) Provision of new boundary wall, driveway, amenity space and new garden shed. (iv) Required site services with utilities connections to existing public sewer, watermain and all associated ancillary site development and enabling works. In accordance with the Habitats Directive and the provisions of Article 250 of the Planning and Development Regulations 2001 (as amended), Appropriate Assessment Screening of the proposed development has been carried out to assess, in view of best scientific knowledge, if the development, individually or in combination with other plans or projects, would be likely to have a significant effect on a European site. It has been detrmined that an Appropriate Assessment is not required in respect of this proposed development. An Environmental Impact Assessment (EIA) screening determination has been made. It has been determined that there is no real likelihood of significant effects on the environment arising from the proposed development and concluded that an Environmental impact Assessment is not required.
Ballykinnacorra North, Ennis Road, Corofin, Co. Clare
to carry out the following development, the construction of a group home and single unit consisting of: (i) Demolition of existing bungalow and garage unit. (ii) Construction of a new Group Home Bungalow and separate apartment unit. (iii) Provision of new driveway, parking areas, amenity space and new garden shed. (iv) Replacement treatment unit and polishing filter, connection to existing watermain and all associated ancillary site development and enabling works. In accordance with the Habitats Directive and the provisions of Article 250 of the Planning and Development Regulations 2001 (as amended), Appropriate Assessment Screening of the proposed development has been carried out to assess, in view of best scientific knowledge, if the development, individually or in combination with other plans or projects, would be likely to have a significant effect on a European site. It has been detrmined that an Appropriate Assessment is not required in respect of this proposed development. An Environmental Impact Assessment (EIA) screening determination has been made. It has been determined that there is no real likelihood of significant effects on the environment arising from the proposed development and concluded that an Environmental impact Assessment is not required.
Townlands of Liscasey and Dehomad, Co. Clare
for a 10-year permission for development of a windfarm at this site of ca. 138ha located entirely within the townlands of Liscasey and Dehomad, County Clare. Certain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details from Clare County Council pursuant to Section 32I of the Planning and Development Act 2000 (as amended) accompanies this planning application. The details unconfirmed in this application are the blade tip height, rotor diameter and hub height of the wind turbines. The range of parameters within which the windfarm will be developed are specified in this site notice and in the Design Flexibility Opinion accompanying the planning application. The Proposed Development for which permission is sought will consist of renewable energy development comprising: • Construction of 6 no. wind turbines, each with an overall blade tip height of between 179.2m and 180m, a rotor diameter of between 149.1m and 150m, and a hub height of between 104.7m and 105m. • Construction of associated turbine hardstands, laydown areas and turbine foundations. • Construction of approximately 6.14km of new internal site access tracks with associated drainage infrastructure (including the upgrade of approximately 0.49km of existing forestry tracks) and on-site passing bays. • Construction of 1 no. new permanent site entrance from the N68, providing access to the proposed development site, inclusive of temporary works to facilitate the delivery of abnormal loads and turbine components. • The demolition of a single storey agricultural shed measuring ca. 41.3sqm, to facilitate the construction of a new on-site 38kV electrical substation; • Construction of a permanent on-site 38kV electrical substation within a compound measuring ca. 1,327 sqm, a substation building of ca. 161.7 sqm containing an MV Switchgear room, IPP control room, ESB control room, storeroom, office; a wind LiDAR system, 2 no. lightning masts, security fencing and gates, internal access, parking, underground cabling, and all ancillary structures and works. • Construction of a Battery Energy Storage System (BESS) compound measuring ca. 1,828 sqm, comprising 20 no. BESS units, each containing one smart skid and four battery pods (each unit approximately 7.4m long, 2.7m wide and 4.1m high), 5 no. Medium Voltage Station (MVS) units (each approximately 8.3m long, 2.1 m wide and 3.0m high), associated plant and equipment, security fencing and gates, internal access, underground cabling, and all ancillary works. •Construction of underground 33kV internal collector cabling, including ancillary works, to connect the proposed windfarm to the proposed on-site 38kV substation. •Construction of 1no. temporary site office (ca.20sqm), 2 no temporary construction compounds (total area of ca.1.12ha) including site offices, welfare facilities, parking and storage areas. •Provision of on-site drainage and sediment control infrastructure which utilises Sustainable Drainage Systems (SuDS), including the use of permeable surfaces, attenuation/detention basins, shallow ditches/swales, stone check dams and silt fences. •Construction of 2 no. on-site water course crossings with piped culverts. •Development of 3 no. temporary on-site construction borrow pits measuring total area of ca.0.72ha. • On-site forestry felling of between ca.35.99 to 36.02ha to facilitate the construction and operation of the development. • All associated site development works and habitat management measures including peatland restoration, marsh fritillary habitat management, forest-to-bog restoration, native hedgerow and treeline enhancement and establishment. • All associated infrastructure, services and siteworks including excavation, earthworks, peat and spoil management and landscaping. Permission is sought for a 35-year operational period from the date of commissioning of the final turbine and battery energy storage system, followed by decommissioning and site reinstatement. Permanent permission is sought for the on-site substation. A Turbine Delivery Route (TDR) has been assessed from Shannon Foynes Port via the L6188, N69, N18/M18, N85 and N68, and no works are required along the route other than the proposed permanent site entrance off the N68 outlined above. Two potential underground grid connection route (GCR) options outlined below and associated works do not form part of this planning application and will be the subject of a separate future planning application: • Option 1: An underground cable route of ca.18.16km connecting to the existing Prospect 220kV Substation within the townlands of Dehomad, Lisscasey, Gortygeeheen, Crag, Ballyduneen, Carrowreagh West, Derrynageeha, Derrynalecka, Moy, Derriniddane, Derryshaan, Derrygeeha, Prospect, Clonderalaw, Cloonarass, Ballygeery East and West. •Option 2: An underground cable route of ca.14.01km connecting to the Cranny 38kV Substation within the townlands of Dehomad, Liscasey, Gortygeeheen, Breaghva West, Leamnaleaha, Tonlegee, Lisnafaha, Craghera, Shessiv, Burrenfadda, Carrowreagh East. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) prepared in respect of the proposed development, in combination with the TDR and future GCR options as a single integrated project. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001, as amended shall apply
612 CROSSROADS, KILLALOE, CO. CLARE, V94 WCC8
the construction of an extension to existing dwelling house, internal modifications, entrance canopy, elevation changes, modified entrance driveway, boundary wall modification and all associated site works
15 Dun na Choille, Sixmilebridge, Clare
construction of a single storey extension to the rear of the as-permitted dwelling together with all associated ancillary and incidental site works. The above were previously granted planning permission (P18-519, P23-60105 & 26-60223 Refer).
Considine Terrace &, Pound Lane, Ennis, Co. Clare, V95 VK84
to RETAIN commercial building as constructed currently used as a garage together with all associated site development works and services
Ballygriffy South, Fountain, Ennis, Co.Clare
construct a new dwelling house, septic tank sewage treatment system, access to public road and associated site works
Ballygriffy South, Fountain, Ennis, Co.Clare
to construct a new dwelling house, septic tank sewage treatment system and access to public and associated site works
Fahee North, Carron, Co Clare V95 VW44
to retain the alterations to the dwelling and for permission to revise the site boundaries previously granted under reference P06/72 and all asoociated site and ancillary works
Scalpnagown, Ballinruan, Co Clare
to refurbish derelict dwelling, construct extension, upgrade entrance and all associted site works
16 Cregg Ard, Lahinch, Co. Clare, V95 W0H6
for alterations to the development previously permitted under planning Ref P25/251, consisting of changes to the rear and side extensions previously approved and to the roof of the existing house, and planning permission to construct a garden store to the rear of the house and all associated site works
Roo West, Ardnacrusha, Co Clare
to construct dwelling house, garage, bored well, wastewater treatment system, percolation area, entrance and all associated site works
Glendree Lr, Feakle, Co Clare
to retain the existing owner operated, year round, short term holiday letting cottage beside the main house. The property accommodated a maximum of 2 people at full capacity
10 Inis Ri, Shannon, Co. Clare, V14D275
to demolish existing Two storey pyrite damaged dwelling and planning permission to construct a redesigned replacement Two Storey Dwelling including all associated site development works
Knockanoura, Quin, Co. Clare
to erect a dwelling house and garage, install an effluent treatment and soil polishing filter and all associated site works
Ballynakillew, Whitegate, Co. Clare
the development will consist of a construct a new dwelling house, site entrance, wastewater treatment system and associated site works and services
How this is counted
The largest applications are ranked by the units each one states; applications that state only a floor area are not ranked with them. An application belongs to the week it was published; the date it was received is shown separately. Figures cover 26 Oct 2026–1 Nov 2026.