Latest planning applications.
774 recorded by 8 Nov 2026 · Later council validations are not added.
774 planning applications were published this week across 26 counties. Together they state 5,434 units, and 774 link to the council's own file. Each shows the date it was received.
Largest applications this week
By units statedAll applications this week
8 recordsThe figures at the top of this page are for all of Ireland; this list shows Roscommon only.
Cuilleen, Creagh, Ballinasloe, Co. Roscommon.
Permission to construct Horse stables on his lands at
Lisagallan, Cloverhill, Co. Roscommon, F42 A006.
Permission for the following1.To demolish portion of the existing house and shed, 2.To refurbish derelict house to include alterations to elevations and construct new extension to same, 3.To remove the existing unauthorised septic tank and percolation area and install new wastewater treatment system and percolation area, 4.To form a new site entrance with winged walls, 5.To retain the existing mobile home, and carry out all ancillary site development works at
Lissanisky, Kilcash, Moydow, Moneymore, Knockmeane, and Skrine, Athlone North, County Roscommon
We, Natural Forces Renewable Energy Limited, intend to apply for a 10-year planning permission for a development located in the townlands of Lissanisky, Kilcash, Moydow, Moneymore, Knockmeane and Skrine Co. Roscommon with a total site area of 12.33 hectares. The development, an amendment to the previously consented development (Ref. 2360142 & ACP. PL20.319800) will consist of; • The construction of one Enercon E138 Wind Energy Converter on a 99.79m tower with an electrical rating of 4.5MW and an overall tip height of 169.9m; • An amendment to substation design, changing from a block-built to a modular design comprising of 2 single-story prefabricated modules surrounded by stock proof fencing; an ESB module measuring 14.33 m² and height of 3.41m and; an IPP module measuring 33.31 m² and 3.89m in height; • An amendment to the statutory redline boundary to incorporate the following; • 20kV overhead line (OHL) and underground cable (UGC) between the permitted IPP substation and the point of connection to the national grid, comprising c.507m of OHL across private lands and c.985m of UGC within the L7135; and • All associated ancillary infrastructure and preparatory works such as the provision of the turbine delivery / haulage route, site access track and the provision of the new site entrance from the L7086. The operational lifespan of the development will be 35 years from the date of commercial operation. This planning application is subject to a Natura Impact Statement (NIS) This development is covered by the provision of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Bellaugh, Athlone, Co.Roscommon.
Retention permission for a hard surfaced area/car park, vehicular access/egress, mini ESB building and general storage building at
Woodview, Barrymore, Kiltoom, Co. Roscommon, N37 HP65.
Permission for the construction of a single storey extension to the side of an existing single storey private dwelling to include all internal and external alterations to the dwelling; for the demolition of an existing ancillary shed and construction of a new ancillary shed within the property; and for all associated site development works at
Lissanisky, Kilcash, Moydow, Moneymore, Knockmeane, and Skrine, Athlone North, County Roscommon
We, Natural Forces Renewable Energy Limited, intend to apply for a 10-year planning permission for a development located in the townlands of Lissanisky, Kilcash, Moydow, Moneymore, Knockmeane and Skrine Co. Roscommon with a total site area of 12.33 hectares. The development, an amendment to the previously consented development (Ref. 2360142 & ACP. PL20.319800) will consist of; • The construction of one Enercon E138 Wind Energy Converter on a 99.79m tower with an electrical rating of 4.5MW and an overall tip height of 169.9m; • An amendment to substation design, changing from a block-built to a modular design comprising of 2 single-story prefabricated modules surrounded by stock proof fencing; an ESB module measuring 14.33 m² and height of 3.41m and; an IPP module measuring 33.31 m² and 3.89m in height; • An amendment to the statutory redline boundary to incorporate the following; • 20kV overhead line (OHL) and underground cable (UGC) between the permitted IPP substation and the point of connection to the national grid, comprising c.507m of OHL across private lands and c.985m of UGC within the L7135; and • All associated ancillary infrastructure and preparatory works such as the provision of the turbine delivery / haulage route, site access track and the provision of the new site entrance from the L7086. The operational lifespan of the development will be 35 years from the date of commercial operation. This planning application is subject to a Natura Impact Statement (NIS) This development is covered by the provision of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Kilmocolmock, Drum, Athlone., N37N274
Planning permission to construct a dwelling house and domestic garage with treatment plant, percolation area and all associated site works at
Greagh Td, Arigna, Co. Roscommon.
Permission for the construction of a dwelling house, on site wastewater treatment system, access onto the public road and associated site development works at
How this is counted
The largest applications are ranked by the units each one states; applications that state only a floor area are not ranked with them. An application belongs to the week it was published; the date it was received is shown separately. Figures cover 26 Oct 2026–1 Nov 2026.