Refusal decisions · 9–15 Nov 2026
The refusal total is final. 18 evidence-complete decision cards are available below.
What this means
Applications were most often refused because the proposal did not fit its site or surroundings, created access or road-safety problems, conflicted with zoning or rural-housing policy, lacked enough technical evidence to demonstrate its impacts were acceptable or involved unauthorised works or retention.
18 of 39 records carry official reason text
37 published statements, 2.1 per analysed application
11 refused on more than one ground, up to 5
Most common pairs
- 8 Design + Zoning/policy
- 7 Design + Transport/access
- 6 Missing evidence + Transport/access
All ten refusal themes
Applications · statements- 01 Design, scale, character or visual impact 12
- 02 Traffic, access, parking or road safety 11
- 03 Zoning, land use, settlement policy or rural housing need 10
- 04 Missing or insufficient evidence, surveys or technical detail 7
- 05 Unauthorised development, retention or procedural history 6
- 06 Residential amenity, privacy, light or noise 5
- 07 Built heritage or archaeology 2
- 08 Ecology, habitats or Natura impacts 2
- 09 Wastewater, effluent, groundwater or public health 2
- 10 Surface-water drainage or flood risk 0
Refusal decisions · 9–15 Nov 2026
0 of 0 cards shown · 18 case links · 0 linked projects
The figures at the top of this page are for all of Ireland; this list shows Meath only.
The verified refusal total remains shown above.