Refusal decisions · 9–15 Nov 2026

39Refusals
18Official evidence
18Substantive reasons
0Verification only
21Pending
21 of 39 refusal decisions are awaiting official decision evidence and not included below.

The refusal total is final. 18 evidence-complete decision cards are available below.

What this means

Applications were most often refused because the proposal did not fit its site or surroundings, created access or road-safety problems, conflicted with zoning or rural-housing policy, lacked enough technical evidence to demonstrate its impacts were acceptable or involved unauthorised works or retention.

18 of 39 records carry official reason text

37 published statements, 2.1 per analysed application

11 refused on more than one ground, up to 5

Most common pairs

  1. 8 Design + Zoning/policy
  2. 7 Design + Transport/access
  3. 6 Missing evidence + Transport/access

All ten refusal themes

Applications · statements
  1. 01 Design, scale, character or visual impact 12
  2. 02 Traffic, access, parking or road safety 11
  3. 03 Zoning, land use, settlement policy or rural housing need 10
  4. 04 Missing or insufficient evidence, surveys or technical detail 7
  5. 05 Unauthorised development, retention or procedural history 6
  6. 06 Residential amenity, privacy, light or noise 5
  7. 07 Built heritage or archaeology 2
  8. 08 Ecology, habitats or Natura impacts 2
  9. 09 Wastewater, effluent, groundwater or public health 2
  10. 10 Surface-water drainage or flood risk 0

Refusal decisions · 9–15 Nov 2026

0 of 0 cards shown · 18 case links · 0 linked projects

The figures at the top of this page are for all of Ireland; this list shows Monaghan only.

No refusals with official reasons are available yet.

The verified refusal total remains shown above.