Made directly to An Coimisiún Pleanála

Cases made directly to An Coimisiún Pleanála

1,520 cases on record, 1,266 decided. Newest first.

Major projects decided by An Coimisiún Pleanála: strategic infrastructure, local authority projects, compulsory acquisition and more. They go straight to An Coimisiún Pleanála, not to a council. Check the official case file before you act.

Get alerts for these casesFree. We email you when a case is lodged or decided.

Sign in to get these cases by email when they are lodged or decided. Alerts are free with an account.

Where the cases are

1,433 cases on the map

Lodged Decided Oral hearing

87 recent cases have no published location yet and are listed only.

Newest cases

Showing 351–375 of 1,520
Strategic infrastructure Case 319566 Kerry County Council

The proposed development will comprise of a 600MW Powerplant, 120MW Battery Energy Storage System, Above Ground Installation…

Located within the townlands Kilcolgan Lower and Ralappane between Tarbert and Ballylongford Co.Kerry. (www.steppowerplant.com)

The proposed development will comprise of a 600MW Powerplant, 120MW Battery Energy Storage System, Above Ground Installation and associated ancillary works.

Substitute consent Case 319580 Meath County Council

Application for permission under Section 37L in relation to further quarry development and continuation of use of the…

Tromman Quarry, Tromman, Rathmolyon, Co. Meath, A83 DA36.

Application for permission under Section 37L in relation to further quarry development and continuation of use of the ancillary works and structures under substitute consent application ABP-319397-24 and for the life of the quarry, restoration and rehabilitation of whole quarry site. An EIAR and NIS accompanies this application.

Substitute consent Case 319466 Donegal County Council

Substitute Consent application for 25 no.

Townlands of Croaghonagh and Meenbog, Co. Donegal

Substitute Consent application for 25 no. deviations from the permitted Meenbog Windfarm development (granted under ABP PA05E.300460).

Strategic infrastructure Case 319422 Fingal County Council

Proposed development of a 400 kV underground cable

Between the existing Woodland Substation, Batterstown, County Meath and the existing Belcamp Substation, Clonshaugh, Fingal, County Dublin, known as the ‘East Meath ’ North Dublin Grid Upgrade. https://www.eirgrideastmeathnorthdublin.ie/

Strategic infrastructure Case 319252 Kildare County Council

Proposed 220kV AIS single bay tail-fed electricity substation with the associated grid connection between the proposed…

located in the townlands of Delamain and Dunnstown, Co. Kildare. (www.delamain220kvsubstation.ie)

Proposed 220kV AIS single bay tail-fed electricity substation with the associated grid connection between the proposed substation and the existing Dunnstown 440/200kV substation comprising of 220kV underground electricity cables and all associated site works

Appropriate assessment Case 319264 Fingal County Council

Proposed development works include the following: I) Construction of a new sheet pile pier with a 3-metre offset to replace…

Skerries Harbour Pier, Skerries, Co. Dublin.

Proposed development works include the following: I) Construction of a new sheet pile pier with a 3-metre offset to replace the existing sheet pile structure, which the effects of corrosion have compromised, II) Encasing a new sheet pile structure in a concrete fa?ade introduces an impermeable layer to enhance the performance and longevity of the sheet pile.

Strategic infrastructure Case 319080 Clare County Council

Proposed transition and conversion of the existing 900MW electricity generating station from coal to heavy fuel oil and…

Moneypoint Generating Station, Moneypoint, Co. Clare.

Proposed transition and conversion of the existing 900MW electricity generating station from coal to heavy fuel oil and associated ancillary development at Moneypoint Generating Station, Moneypoint, Co. Clare. www.moneypointsecurityofsupply.ie

Strategic infrastructure Case 319023 Offaly County Council

Combined Cycle Gas Turbine and Open Cycle Gas Turbine Thermal Power Plant, Electricity Grid Connection including 2 no.

on land within the townlands Knockdrin, Derrygreenagh, Derryarkin, Derryiron, Ballybeg, Coolcor, Barrysbrook, Clonin, Togher and Coole, Co. Offaly. (www.derrygreenaghpowerplanning.ie)

Combined Cycle Gas Turbine and Open Cycle Gas Turbine Thermal Power Plant, Electricity Grid Connection including 2 no. substations, and associated buildings, plant, site works, service and ancillary development

Case records from An Coimisiún Pleanála, with case activity up to 1 Oct 2026. Cases lodged in recent months come from the official case search and get a map location when the published case data catches up. Observer, appellant and submitter details are not shown. How we collect this.