New build
07 Oct 2024 · Latest notice
2 notices · phased
Clonmel, Tipperary · Tipperary County Council · Planning ref 21515 , 21636
Construction of 90 residential units in a mix of one and two storey units and all associated ancillary site works.
Notice identity Works stated Scale Commenced
NBCO:CN0120415TT NBCO historical file
Construction of 90 residential units in a mix of one and two storey units and all associated ancillary site works.
114 units · 713.7 m²Builder not named
07 Oct 2024
CN0120415TT BCMS owner-supplied export
Construction of 90 residential units in a mix of one and two storey units and all associated ancillary site works.
90 units · 9,467.0 m²Builder named
07 Oct 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
03 Oct 2024 · Latest notice
5 notices · phased
Enniscorthy, Wexford · Wexford County Council · Planning ref 20231184
Permission is sought for the construction of 49 new houses (Phase 2), Cnoc na Greine, Greenville lane, Enniscorthy, Co. Wexford, and all associated site works.
Notice-stated scale
169 units · 5,717.2 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
NBCO:CN0120357WX NBCO historical file
Permission is sought for the Construction of Apartment Block 1-16 The Alders, Cnoc na Greine, Greenville Lane, Enniscorthy, Co. Wexford along with all associated site works.
169 units · 927.7 m²Builder not named
03 Oct 2024
CN0120357WX BCMS owner-supplied export
Permission is sought for the Construction of Apartment Block 1-16 The Alders, Cnoc na Greine, Greenville Lane, Enniscorthy, Co. Wexford along with all associated site works.
16 units · 927.7 m²Builder not named
03 Oct 2024
CN0120125WX BCMS open-data feed
Permission is sought for the Construction of Apartment Block 21 to 28 the Hawthorn at Cnoc na Greine, Greenville lane, Enniscorthy, Co. Wexford. Along with all associated site works.
8 units · 390.4 m²Builder not named
30 Sep 2024
CN0120123WX BCMS owner-supplied export
Permission is sought for the Construction of Apartment block 01-08 the Hawthorn at Cnoc na Greine, Greenville lane, Enniscorthy, Co. Wexford along with all associated site works.
8 units · 390.4 m²Builder not named
27 Sep 2024
CN0120028WX BCMS open-data feed
Permission is sought for the construction of 49 new houses (Phase 2), Cnoc na Greine, Greenville lane, Enniscorthy, Co. Wexford, and all associated site works.
49 units · 5,717.2 m²Builder not named
01 Jul 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
03 Oct 2024 · Latest notice
2 notices · phased
Glounthaune, Cork · Cork County Council · Planning ref 21/06851
The Cedars Estate, Lackenroe, Glounthaune, Co. Cork - The demolition of 2 farmhouse buildings and a derelict dwelling. The construction of 21 no. two-storey dwellings. The construction will compromise of 16 no. 3 bed semi- detached units, 4 no. 4 bed semidetached units and 1 no. 4 bed detached unit and all ancillary site development works.
Notice identity Works stated Scale Commenced
NBCO:CN0120514CC NBCO historical file
The Cedars Estate, Lackenroe, Glounthaune, Co. Cork - The demolition of 2 farmhouse buildings and a derelict dwelling. The construction of 21 no. two-storey dwellings. The construction will compromise of 16 no. 3 bed semi-detached units, 4 no. 4 bed semidetached units and 1 no. 4 bed detached unit and all ancillary site development works.
21 units · 441.9 m²Builder not named
03 Oct 2024
CN0120514CC BCMS owner-supplied export
The Cedars Estate, Lackenroe, Glounthaune, Co. Cork - The demolition of 2 farmhouse buildings and a derelict dwelling. The construction of 21 no. two-storey dwellings. The construction will compromise of 16 no. 3 bed semi- detached units, 4 no. 4 bed semidetached units and 1 no. 4 bed detached unit and all ancillary site development works.
21 units · 2,313.3 m²Builder named
03 Oct 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
02 Oct 2024 · Latest notice
5 notices · phased
Kellystown, Dublin · Fingal County Council · Planning ref ABP-312318-21
Proposed construction of five -storey residential block (Block B) forming part of the Kellystown SHD2 development At Kellystown, Dublin 15
Notice identity Works stated Scale Commenced
NBCO:CN0120460FL NBCO historical file
Proposed construction of six-storey residential block (Block C) forming part of the Kellystown SHD2 development At Kellystown, Dublin 15
24 units · 2,558 m²Builder not named
02 Oct 2024
NBCO:CN0120461FL NBCO historical file
Proposed construction of five -storey residential block (Block B) forming part of the Kellystown SHD2 development At Kellystown, Dublin 15
34 units · 3,971.6 m²Builder not named
02 Oct 2024
CN0120460FL BCMS owner-supplied export
Proposed construction of six- storey residential block (Block C) forming part of the Kellystown SHD2 development At Kellystown, Dublin 15
24 units · 2,558 m²Builder named
02 Oct 2024
CN0120461FL BCMS owner-supplied export
Proposed construction of five -storey residential block (Block B) forming part of the Kellystown SHD2 development At Kellystown, Dublin 15
34 units · 3,971.6 m²Builder named
02 Oct 2024
CN0111523FL BCMS open-data feed
Construction of 123no. residential units in a mix of 2 & 3 Story, Detached, Semi Detached and Terraced Houses along with associated site works. Constructed as part of 349 Unit Development Luttrellstown Gate, Kellystown granted under permission ABP-312318-21.
123 units · 13,689 m²Builder not named
25 Mar 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
02 Oct 2024 · Latest notice
2 notices · phased
Passage West, Cork · Cork County Council · Planning ref ABP306998-20
Mariner's View, Maulbaun, Passage West, Co. Cork: Construction of a residential development of 31 no. apartments and 9 no. dwelling houses (Nos. 1-40) and all ancillary site development works.
Notice identity Works stated Scale Commenced
NBCO:CN0120208CC NBCO historical file
Mariner's View, Maulbaun, Passage West, Co. Cork: Construction of a residential development of 31 no. apartments and 9 no. dwelling houses (Nos. 1-40) and all ancillary site development works.
40 units · 3,698.7 m²Builder not named
02 Oct 2024
CN0120208CC BCMS owner-supplied export
Mariner's View, Maulbaun, Passage West, Co. Cork: Construction of a residential development of 31 no. apartments and 9 no. dwelling houses (Nos. 1-40) and all ancillary site development works.
40 units · 11,157.9 m²Builder named
02 Oct 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
02 Oct 2024 · Latest notice
6 notices · phased
Portlaoise, Laois · Laois County Council · Planning ref 19/670 ABP-308653-20
Phase 1: Construction 34no. dwellings consisting of 20no. semi- detached; 12no. Terraced and 2no. Detached at Cedar Woods, Mountmellick Road, Portlaise, Co. Laois.
Notice identity Works stated Scale Commenced
NBCO:CN0120537LS NBCO historical file
Phase 1: Construction 34no. dwellings consisting of 20no. semi-detached; 12no. Terraced and 2no. Detached at Cedar Woods, Mountmellick Road, Portlaise, Co. Laois.
50 units · 3,312.4 m²Builder not named
02 Oct 2024
CN0120537LS BCMS owner-supplied export
Phase 1: Construction 34no. dwellings consisting of 20no. semi- detached; 12no. Terraced and 2no. Detached at Cedar Woods, Mountmellick Road, Portlaise, Co. Laois.
34 units · 53,601.8 m²Builder named
02 Oct 2024
SN0010331LS BCMS open-data feed
Block B: Proposed Residential Developmnet -Cedar Clinic, Mountmellick Road, Portlaoise Co. Laois.
6 units · 476 m²Builder not named
26 Apr 2024
CN0114397LS BCMS owner-supplied export
Phase 1: Construction 34no. dwellings consisting of 20no. Semi Detached; 12no. Terraced and 2no. Detached at Cedar Woods, Mountmelick Road, Portlaise, Co. Laois
34 units · 136,000 m²Builder named
23 Apr 2024
SN0010330LS BCMS open-data feed
Block A: Proposed Residential Development - Cedar Clinic Mountmellick Road, Portlaoise, Co. Laois.
4 units · 322 m²Builder not named
22 Apr 2024
SN0010332LS BCMS open-data feed
Block C: Proposed Residential Development - Cedar Clinic, Mountmellick Road, Portlaoise Co. Laois.
6 units · 476 m²Builder not named
22 Apr 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
01 Oct 2024 · Latest notice
3 notices · phased
Loughlinstown, Dublin · Dun Laoghaire Rathdown County Council · Planning ref DZ21A/0414
107 units in 3 urban blocks.64 apartments and 43 houses.
Notice identity Works stated Scale Commenced
NBCO:SN0011226DR NBCO historical file
Construction of 57 apartments over basement carpark, Cherrywood Res 2
57 units · 7,127 m²Builder not named
01 Oct 2024
SN0011226DR BCMS open-data feed
Construction of 57 apartments over basement carpark, Cherrywood Res 2
57 units · 7,127 m²Builder not named
30 Sep 2024
CN0108617DR BCMS owner-supplied export
107 units in 3 urban blocks.64 apartments and 43 houses.
43 units · 86,000 m²Builder named
08 Jan 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
19 notices · phased
Dunshaughlin, Meath · Meath County Council · Planning ref ABP 303433-19
Construction of House No's for Cell 19, 16-23 Oak Park, 31-34 Birch Grove, 1-9 Birch Way & 1-6 Birch Place. and for Cell 20, 10-18 Birch Way, 27-30 Birch Grove, 1-9 Birch Manor & 7-12 Birch Place, part of a residential development permitted under planning permission ABP 303433-19 at The Willows, Dunshaughlin, Co. Meath.
Notice identity Works stated Scale Commenced
SN0011260MH BCMS open-data feed
Construction of 51 apartments at Oak Hall, Block B, The Willows, Dunshaughlin, Co. Meath
51 units · 5,800 m²Builder not named
30 Sep 2024
CN0118404MH BCMS open-data feed
Construction of House No.s 4-10 Birch Court, 1-10 Ash Avenue, 1-7 Ash View, 1-10 Ash Grove for Cell 10 part of a residential development permitted under planning permission ABP 303433-19 at The Willows, Dunshaughlin, Co. Meath.
34 units · 3,785.5 m²Builder not named
16 Aug 2024
CN0106664MH BCMS open-data feed
Construction of House No’s for Cell 8 (13-15 Oak Park, 1-11 Birch View, & 1-10 Birch Avenue) and for Cell 9 (12-26 Birch View, 1-3 Birch Court, & 11-24 Birch Avenue) part of a residential development permitted under planning permission ABP 303433-19 as amended by ABP 307946-20 and 22/1594 at The Willows, Dunshaughlin, Co. Meath.
56 units · 6,887.7 m²Builder not named
26 Oct 2023
CN0101158MH BCMS open-data feed
Construction of House No's for Cell 19, 16-23 Oak Park, 31-34 Birch Grove, 1-9 Birch Way & 1-6 Birch Place. and for Cell 20, 10-18 Birch Way, 27-30 Birch Grove, 1-9 Birch Manor & 7-12 Birch Place, part of a residential development permitted under planning permission ABP303433-19 at The Willows, Dunshaughlin, Co. Meath.
55 units · 6,501 m²Builder not named
29 May 2023
CN0099063MH BCMS owner-supplied export
Construction of House No's for Cell 19, 16-23 Oak Park, 31-34 Birch Grove, 1-9 Birch Way & 1-6 Birch Place. and for Cell 20, 10-18 Birch Way, 27-30 Birch Grove, 1-9 Birch Manor & 7-12 Birch Place, part of a residential development permitted under planning permission ABP 303433-19 at The Willows, Dunshaughlin, Co. Meath.
408 units · 6,501 m²Builder named
29 Mar 2023
CN0097981MH BCMS owner-supplied export
Construction of House no.s 1-9 Oak Park, 5-10 Oak View, 20-24 Oak Place & 33-36 Oak Way, part of a residential development permitted under planning permission APB 303433-19 at The Willows, Dunshaughlin Co. Meath
408 units · 2,831 m²Builder named
27 Feb 2023
CN0084813MH BCMS open-data feed
Commencement of house units 1-11 & 18-29 Oak Manor, 1-21 Oak Avenue & 10-12 Oak Park, The Willows, Dunshaughlin, Co. Meath.
47 units · 5,590.1 m²Builder not named
04 Jan 2022
CN0082304MH BCMS open-data feed
Commencement of Houses 21-24 Oak Village, 12-17 Oak Manor, 17-19 Oak Pointe & 12-19 Oak Place, The Willows, Dunshaughlin, Co. Meath.
21 units · 2,507.1 m²Builder not named
15 Oct 2021
SN0006471MH BCMS open-data feed
Three Storey Building consisting of 10 no. Ground Floor Apartments & 10 no. duplexes on upper levels at 1-20 Oak Village, The Willows, Dunshaughlin, Co. Meath.
20 units · 1,531.6 m²Builder not named
03 Sep 2021
CN0080516MH BCMS open-data feed
Commencement of Houses 57-59 Oak Way, 1-11 Oak Place & 2-4 Oak View, The Willows, Dunshaughlin, Co. Meath.
17 units · 1,964.2 m²Builder not named
31 Aug 2021
CN0077245MH BCMS owner-supplied export
Commencement of house units 1-24 Oak Court, The Willows, Dunshaughlin, Co. Meath.
407 units · 2,718 m²Builder named
14 Jun 2021
CN0077192MH BCMS owner-supplied export
Commencement of house units 1 Oak View & 37-56 Oak Way, The Willows, Dunshaughlin, Co. Meath
407 units · 2,319 m²Builder named
08 Jun 2021
SN0006128MH BCMS open-data feed
Construction construction of 72 apartments Oak Hall, Block A, The Willows, Dunshaughlin, Co. Meath
72 units · 6,337 m²Builder not named
03 Jun 2021
CN0070010MH BCMS open-data feed
Commencement of house units 1-28 & 53-58 Willow Grove, The Willows, Dunshaughlin, County Meath.
34 units · 4,043.2 m²Builder not named
06 Nov 2020
CN0067682MH BCMS owner-supplied export
Commencement of house units 41-52 Willow Grove, The Willows, Dunshaughlin, Co. Meath.
407 units · 1,325.5 m²Builder named
31 Aug 2020
CN0066493MH BCMS owner-supplied export
Commencement of house units 29-40 Willow Grove, The Willows, Dunshaughlin, County Meath.
407 units · 1,639.4 m²Builder named
24 Jul 2020
CN0061870MH BCMS open-data feed
Phase 1D - The Willows, 67-74, 80-84 Willow Drive, 50 Willow Avenue & 59-66 Willow Grove
22 units · 2,563 m²Builder not named
18 Feb 2020
CN0059386MH BCMS owner-supplied export
Commencement of House units 61 to 66 and 75 to 79 Willow Drive and 49 Willow Avenue, That Willows, Dunshaughlin, County Meath.
12 units · 1,527 m²Builder named
26 Nov 2019
CN0056778MH BCMS open-data feed
Phase 1D - House units 22-48 & 51-55 Willow Avenue, The Willows, Dunshaughlin, County Meath.
32 units · 3,625.6 m²Builder not named
19 Sep 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Commenced
1 notice · 1 source identity
Dundalk, Louth · Louth County Council · Planning ref 22259
Permission consists of a total of 60no. dwellings (15no. 2-bed, 37 no. 3-bed, 8no. 4-bed). A new vehicular access and a dedicated pedestrian access will be provided off Red Barns Road. The application also provides for car and bicycle parking, landscaping, open space and boundary treatments including alternations to site levels (the site will be raised to accommodate the proposed development), retaining walls and public lighting and all associated site development works.
New build
30 Sep 2024 · Latest notice
22 notices · phased
Douglas, Cork · Cork City Council · Planning ref ABP-307041-20
The construction of 121 no. 2/3 storey dwelling houses and associated site works. This is Phase 2a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
Notice identity Works stated Scale Commenced
CN0120061CY BCMS open-data feed
The construction of 121 no. 2/3 storey dwelling houses and associated site works. This is Phase 2a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
121 units · 11,298.6 m²Builder not named
30 Sep 2024
SN0010170CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block H, No's 22 & 23, The Green, Belview Wood. This is Phase 1K of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010174CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block J, No's 32 & 33, The Green, Belview Wood. This is Phase 1M of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
CN0113810CY BCMS open-data feed
The construction of 129 no. 2/3 storey dwelling houses and associated site works. This is Phase 1H of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
129 units · 12,994.2 m²Builder not named
24 Apr 2024
SN0010179CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block I, No's 36 & 37, The Green, Belview Wood. This is Phase 1L of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
CN0113651CY BCMS open-data feed
The construction of 36 no 2-storey dwelling houses and associated site works. This is Phase 1g of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
36 units · 3,339.9 m²Builder not named
24 Apr 2024
SN0010171CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block F, No's 14, 15, 16 & 17, The Green, Belview Wood. This is Phase 1I of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010172CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block G, No's 18, 19, 20 & 21, The Green, Belview Wood. This is Phase 1J of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010173CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block K, No's 20 & 21, The View, Belview Wood. This is Phase 1n of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010182CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block M, No's 03, 04, 05 & 06, The Heights, Belview Wood. This is Phase 1P of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010185CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block P, No's 22 & 23, The View, Belview Wood. This is Phase 1S of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010187CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block O, No's 11 & 12, The Heights, Belview Wood. This is Phase 1R of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010200CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block L, No's 01 & 02, The Heights, Belview Wood. This is Phase 1o of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010228CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block N, No's 07, 08, 09 & 10, The Heights, Belview Wood. This is Phase 1Q of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0009903CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block E, No's 11 & 12, The Green, Belview Wood. This is Phase 1f of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009909CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block C, No's 46 & 47, The Green, Belview Wood. This is Phase 1d of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009928CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block D, No's 42 & 43, The Green, Belview Wood. This is Phase 1e of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009741CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at No's 1 & 2, The Green, Belview Wood. This is Phase 1a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
23 Feb 2024
SN0009742CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at No's 9 & 10, The Green, Belview Wood. This is Phase 1b of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
23 Feb 2024
CN0110170CY BCMS open-data feed
The construction of 8 no 2-storey dwelling houses and associated site works. This is Phase 1c of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
8 units · 696.6 m²Builder not named
22 Feb 2024
CN0108602CY BCMS open-data feed
The construction of 19 no 2/3 storey dwelling houses and associated site works. This is Phase 1 of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
19 units · 2,308.4 m²Builder not named
02 Jan 2024
CN0080886CY BCMS owner-supplied export
Construction of 6No. Residential Units (Numbers 10, 11, 12, 14, 15 & 16) and all associated Site Works at 'The Mews', Belview Wood, Maryborough, Douglas, Co. Cork.
6 units · 3,136.8 m²Builder named
13 Sep 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
5 notices · phased
Dublin, Dublin · Dun Laoghaire Rathdown County Council · Planning ref LRD24A/0482/WEB (ABP-305844-19)
It is proposed to construct a new development at Woodbrook, Co. Dublin which consists of 3no. Blocks (A, B and C). Block A is an eight-storey apartment building that includes a car park and various ancillary rooms at ground level with a communal podium situated above.
Notice-stated scale
161 units · 15,105 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0011160DR BCMS open-data feed
It is proposed to construct a new development at Woodbrook, Co. Dublin which consists of 3no. Blocks (A, B and C). Block B is an seven-storey apartment building that include various ancillary rooms such as bike stores at ground level.
161 units · 15,105 m²Builder not named
30 Sep 2024
SN0011161DR BCMS open-data feed
It is proposed to construct a new development at Woodbrook, Co. Dublin which consists of 3no. Blocks (A, B and C). Block C is an seven-storey apartment building that includes various ancillary rooms such as bike stores at ground level.
161 units · 15,105 m²Builder not named
30 Sep 2024
SN0011181DR BCMS open-data feed
It is proposed to construct a new development at Woodbrook, Co. Dublin which consists of 3no. Blocks (A, B and C). 3no. two storeys Duplex units are proposed on Block C site adjoined to a single storey bike store.
3 units · 393 m²Builder not named
30 Sep 2024
SN0011182DR BCMS open-data feed
It is proposed to construct a new development at Woodbrook, Co. Dublin which consists of 3no. Blocks (A, B and C). 3no. two storeys Duplex units are proposed on Block B site adjoined to a single storey bike store.
3 units · 393 m²Builder not named
30 Sep 2024
SN0011183DR BCMS open-data feed
It is proposed to construct a new development at Woodbrook, Co. Dublin which consists of 3no. Blocks (A, B and C). Block A is an eight-storey apartment building that includes a car park and various ancillary rooms at ground level with a communal podium situated above.
78 units · 8,612 m²Builder not named
30 Sep 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
7 notices · phased
Clane, Kildare · Kildare County Council · Planning ref 23/972
Construction of 114 dwellings No. 13-55 & 112-182 (known as 1-21 The Birch, 1-16 The Hawthorn, 1-26 The Hazel, 1-24 The Maple and 1-27 The Willow) at Marmion Walk, Clane, Co. Kildare.
Notice-stated scale
114 units · 14,144.4 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0011163KE BCMS open-data feed
Construction of Block F which consists of 8 no. ground floor flats and 8 no. maisonettes at Marmion Walk, Clane, Co. Kildare.
16 units · 1,679.7 m²Builder not named
30 Sep 2024
SN0011109KE BCMS open-data feed
Construction of Block C which consists of 6 no. ground floor flats and 6 no. maisonettes at Marmion Walk, Clane, Co. Kildare.
12 units · 1,232.1 m²Builder not named
18 Sep 2024
SN0011113KE BCMS open-data feed
Construction of Block E which consists of 8 no. ground floor flats and 8 no. maisonettes at Marmion Walk, Clane, Co. Kildare.
16 units · 1,554.1 m²Builder not named
18 Sep 2024
SN0011116KE BCMS open-data feed
Construction of Block D which consists of 6 no. ground floor flats and 6 no. maisonettes at Marmion Walk, Clane, Co. Kildare.
12 units · 1,232.1 m²Builder not named
18 Sep 2024
SN0011120KE BCMS open-data feed
Construction of Block A which consists of 6 no. ground floor flats and 6 no. maisonettes at Marmion Walk, Clane, Co. Kildare.
12 units · 1,007.2 m²Builder not named
18 Sep 2024
CN0119796KE BCMS open-data feed
Construction of 114 dwellings No. 13-55 & 112-182 (known as 1-21 The Birch, 1-16 The Hawthorn, 1-26 The Hazel, 1-24 The Maple and 1-27 The Willow) at Marmion Walk, Clane, Co. Kildare.
114 units · 14,144.4 m²Builder not named
17 Sep 2024
SN0010987KE BCMS open-data feed
Construction of Block B which consists of 4 no. ground floor flats, 4 no. maisonettes, and a two-storey creche at Marmion walk, Clane, Co. Kildare.
8 units · 1,056.4 m²Builder not named
16 Sep 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
3 notices · phased
Cork City, Cork · Cork City Council · Planning ref ABP303098-18
Meadow Brome Phase 2A & 3A - Construction of 37 no. Dwellings No's 26-36, 144-151, 157-166, 15-20, and 170 & 171 which has been permitted under An Bord Pleanala Ref : ABP3033098-18 and all ancillary site development works.
Notice identity Works stated Scale Commenced
SN0011221CY BCMS open-data feed
Meadow Brome Phase 3B Block J- Construction of 10 No. apartment units nos. 170-179. Which has been permitted under An Bord Pleanala Ref ABP-303098-18 and all ancillary site work
10 units · 893.9 m²Builder not named
30 Sep 2024
CN0120098CY BCMS owner-supplied export
Meadow Brome Phase 2A & 3A - Construction of 37 no. Dwellings No's 26-36, 144-151, 157-166, 15-20, and 170 & 171 which has been permitted under An Bord Pleanala Ref : ABP3033098-18 and all ancillary site development works.
37 units · 5,764.6 m²Builder named
26 Sep 2024
CN0113772CY BCMS open-data feed
Meadow Brome Phase 3B- Construction of 16 No. dwellings Nos.235-244 & 246-251. Which has been permitted under An Bord Pleanala Ref ABP-303098-1 and all ancillary site works.
16 units · 1,600 m²Builder not named
24 Apr 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
23 notices · phased
Clane, Kildare · Kildare County Council · Planning ref ABP-304632-19
Construction of Dwellings No. 56-62, 67-70, 75-78 (now known as 5-9 The Drive, 1-2 The Gallops, 7-10 The Gallops, 1-2 The Walk, 7-8 The Walk) at Coachroad Meadows, Clane, Co. Kildare.
Notice identity Works stated Scale Commenced
CN0120456KE BCMS owner-supplied export
Construction of 2no. blocks of apartments. Block 1 being 4 storey with 36 no. apartment and Block 2 being 3 storey with 18 no. apartments.
54 units · 5,198.1 m²Builder not named
30 Sep 2024
SN0010959KE BCMS open-data feed
Construction of 44 no. dwelling apartment block at Coachroad Meadows, Clane, Co. Kildare.
44 units · 4,005 m²Builder not named
16 Sep 2024
CN0119323KE BCMS owner-supplied export
Construction of Dwellings No. 229-236 (also known as 1-8 The Place) at Coachroad Meadows, Clane, Co. Kildare.
182 units · 849.6 m²Builder named
10 Sep 2024
CN0119324KE BCMS owner-supplied export
Construction of Dwellings No. 257-268 (also known as 29-40 The Place) at Coachroad Meadows, Clane, Co. Kildare.
182 units · 849.6 m²Builder named
10 Sep 2024
CN0119325KE BCMS open-data feed
Construction of Dwellings No. 237-248 (also known as 9-20 The Place) at Coachroad Meadows, Clane, Co. Kildare.
12 units · 1,275.6 m²Builder not named
10 Sep 2024
SN0010868KE BCMS open-data feed
Construction of Dwellings No. 249-256 (also known as 21-28 The Place) at Coachroad Meadows, Clane, Co. Kildare.
8 units · 849.6 m²Builder not named
05 Sep 2024
SN0010665KE BCMS open-data feed
Construction of apartments No. 63-66 (now known as 3-6 The Gallops), Coachroad Meadows, Clane, Co. Kildare.
4 units · 235.6 m²Builder not named
12 Jul 2024
SN0010666KE BCMS open-data feed
Construction of apartments No. 71-73 (now known as 3-6 The Walk), Coachroad Meadows, Clane, Co. Kildare.
4 units · 235.6 m²Builder not named
12 Jul 2024
CN0116524KE BCMS owner-supplied export
Construction of Dwellings No. 56-62, 67-70, 75-78 (now known as 5-9 The Drive, 1-2 The Gallops, 7-10 The Gallops, 1-2 The Walk, 7-8 The Walk) at Coachroad Meadows, Clane, Co. Kildare.
182 units · 1,984.5 m²Builder named
28 Jun 2024
CN0106578KE BCMS open-data feed
Construction of Dwellings No. 79-98 (now known as 11-14 The Walk, 1-7 The Paddocks, 1-7 The Hill and 9 & 10 The Walk respectively) at Coachroad Meadows, Clane, Co. Kildare.
20 units · 2,273.7 m²Builder not named
25 Oct 2023
CN0106553KE BCMS owner-supplied export
Construction of Dwellings No. 213-228 (also known as 1-16 The Orchard) at Coachroad Meadows, Clane, Co. Kildare.
182 units · 1,783 m²Builder named
23 Oct 2023
CN0102702KE BCMS open-data feed
Construction of Dwellings No. 169-196 at Capdoo, Clane, Co. Kildare.
28 units · 3,788.0 m²Builder not named
06 Jul 2023
CN0102643KE BCMS owner-supplied export
Construction of Dwellings No. 197-212 at Capdoo, Clane, Co. Kildare.
182 units · 1,783 m²Builder named
23 Jun 2023
CN0101128KE BCMS owner-supplied export
Construction of Dwellings No. 157-168 at Capdoo, Clane, Co. Kildare.
182 units · 1,700.4 m²Builder named
30 May 2023
CN0100205KE BCMS owner-supplied export
Construction of Dwellings No. 143-156 at Capdoo, Clane, Co. Kildare.
182 units · 1,958.2 m²Builder named
02 May 2023
SN0008288KE BCMS open-data feed
Construction of Dwellings No. 197-212 at Capdoo, Clane, Co. Kildare.
16 units · 1,783 m²Builder not named
28 Mar 2023
CN0096894KE BCMS open-data feed
Construction of Dwellings No. 125-142 at Capdoo, Clane, Co. Kildare.
18 units · 2,212.6 m²Builder not named
18 Jan 2023
CN0095972KE BCMS owner-supplied export
Construction of Dwellings No. 52-55 at Capdoo, Clane, Co. Kildare.
182 units · 546.3 m²Builder named
28 Nov 2022
CN0092195KE BCMS owner-supplied export
Construction of Dwellings No. 111-124 at Capdoo, Clane, Co. Kildare
182 units · 1,831.8 m²Builder named
04 Aug 2022
SN0007272KE BCMS open-data feed
Construction of Dwellings No. 46-49 at Capdoo, Clane, Co. Kildare
4 units · 235.6 m²Builder not named
03 Jun 2022
CN0089734KE BCMS owner-supplied export
Construction of Dwellings No. 26-39 & 99-110 at Capdoo, Clane, Co. Kildare
182 units · 3,293.8 m²Builder named
27 May 2022
CN0089085KE BCMS owner-supplied export
Construction of Dwellings No. 19-25, 40-45 & 50-51 at Capdoo, Clane, Co. Kildare
182 units · 1,774.8 m²Builder named
09 May 2022
CN0087961KE BCMS owner-supplied export
Construction of Dwellings No. 1-18 at Capdoo, Clane, Co. Kildare
182 units · 1,881.2 m²Builder named
06 Apr 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
4 notices · phased
Wicklow, Wicklow · Wicklow County Council · Planning ref 22504
1 to 21 Mariners Row & 15 to 17 Mariners View
Notice identity Works stated Scale Commenced
CN0120563WW BCMS owner-supplied export
18 to 28 The View
11 units · 1,495.5 m²Builder named
30 Sep 2024
CN0003826WW BCMS open-data feed
House Units No. 1 to 11 Mariners Rise, 1 to 7 Mariners Cove & 2 to 7 Mariners Bay
24 units · 2,901.8 m²Builder not named
22 Apr 2024
CN0110192WW BCMS owner-supplied export
1 to 21 Mariners Row & 15 to 17 Mariners View
24 units · 3,010.4 m²Builder named
01 Feb 2024
CN0107457WW BCMS owner-supplied export
1 to 8 Mariners Lane, 8 to 15 Mariners Drive & 14 Mariners View
17 units · 2,196.6 m²Builder named
08 Nov 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
5 notices · phased
Drogheda, Louth · Louth County Council · Planning ref 22-877
73 Housing Units at Beaulieu Banks, Termonfeckin Road, Drogheda, Co. Louth.
Notice-stated scale
73 units · 8,347.4 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0011149LH BCMS open-data feed
Duplex Block 1 - Units 58-63 Beaulieu Banks, Termonfeckin Road, Drogheda, Co. Louth.
6 units · 379.2 m²Builder not named
30 Sep 2024
SN0011147LH BCMS open-data feed
Duplex Block 2 - Units 64-69 Beaulieu Banks, Termonfeckin Road, Drogheda, Co. Louth.
6 units · 379.2 m²Builder not named
29 Sep 2024
SN0011148LH BCMS open-data feed
Duplex Block 4 - Units 76-81 Beaulieu Banks, Termonfeckin Road, Drogheda, Co. Louth.
6 units · 379.2 m²Builder not named
29 Sep 2024
SN0011152LH BCMS open-data feed
Duplex Block 3 - Units 70-75 Beaulieu Banks, Termonfeckin Road, Drogheda, Co. Louth.
6 units · 379.2 m²Builder not named
29 Sep 2024
CN0109436LH BCMS open-data feed
73 Housing Units at Beaulieu Banks, Termonfeckin Road, Drogheda, Co. Louth.
73 units · 8,347.4 m²Builder not named
02 Feb 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
2 notices · phased
Raheen, Limerick · Limerick City and County Council · Planning ref 22-313124
Construction of houses of Nos. 1, 152-195 & 204-207 Ballykeeffe, Raheen, Limerick.
Notice identity Works stated Scale Commenced
CN0120182LL BCMS owner-supplied export
Construction of houses of Nos. 1, 152-195 & 204-207 Ballykeeffe, Raheen, Limerick.
182 units · 3,688.5 m²Builder named
30 Sep 2024
CN0114723LL BCMS open-data feed
Construction of house Nos. 2-18 & 196-203 at Ballykeeffe, Raheen, Limerick.
25 units · 3,538.6 m²Builder not named
24 Apr 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
5 notices · phased
Dublin, Dublin · Dublin City Council · Planning ref ABP-313320-22
Construction of a new eight-storey development (Block G), containing 139 No. Apartments, communal amenity room & plant rooms at De La Salle Lands, Ballyfermot, Co.Dublin.
Notice-stated scale
189 units · 21,141.9 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0011169DC BCMS open-data feed
Construction of a new eight-storey development (Block G), containing 139 No. Apartments, communal amenity room & plant rooms at De La Salle Lands, Ballyfermot, Co.Dublin.
139 units · 16,773 m²Builder not named
30 Sep 2024
SN0009554DC BCMS open-data feed
Construction of a new eight-storey development (Block F), containing 113 No. Apartments and communal amenity room and basement parking at De La Salle Lands, Ballyfermot, Dublin 10
113 units · 11,111 m²Builder not named
18 Dec 2023
SN0009336DC BCMS open-data feed
Construction of a new seven-storey development (Block D), containing 189 No. Apartments and communal amenity room, ESB Substation, under croft parking at De La Salle Lands, Ballyfermot, Co.Dublin
189 units · 21,141.9 m²Builder not named
23 Oct 2023
SN0008344DC BCMS open-data feed
Construction of a new eight-storey development (Block B), containing 128 No. Apartments, communal amenity room, Shell and Core Commercial unit at De La Salle Lands, Ballyfermot, Co.Dublin.
128 units · 15,499.2 m²Builder not named
18 Apr 2023
SN0008356DC BCMS open-data feed
Construction of a new seven-storey development (Block C), containing 101 No. Apartments and communal amenity room over basement car park space at De La Salle Lands, Ballyfermot, Co.Dublin
101 units · 13,700.1 m²Builder not named
18 Apr 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Commenced
1 notice · 1 source identity
Kilkenny, Kilkenny · Kilkenny County Council · Planning ref 23/60037
Construction of 130no. dwelling houses and all ancillary site works
New build
30 Sep 2024 · Latest notice
2 notices · phased
Malahide, Dublin · Fingal County Council · Planning ref F22A/0579
Construction of 35 houses at Streamstown, Malahide, Co. Dublin.
Notice identity Works stated Scale Commenced
CN0120442FL BCMS owner-supplied export
Construction of 35 houses at Streamstown, Malahide, Co. Dublin.
35 units · 4,340 m²Builder named
30 Sep 2024
SN0011290FL BCMS open-data feed
Construction of 4-storey apartment block at Streamstown, Malahide, Co. Dublin.
34 units · 3,347 m²Builder not named
30 Sep 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
2 notices · phased
Kildangan, Kildare · Kildare County Council · Planning ref 23/60063
Construction of 44 no. dwellings and all associated site works and services.
Notice identity Works stated Scale Commenced
CN0120472KE BCMS open-data feed
Construction of 44 no. dwellings and all associated site works and services.
44 units · 5,705.8 m²Builder not named
30 Sep 2024
CN0119320KE BCMS owner-supplied export
Construction of 44 no. dwellings and all associated site works and services.
44 units · 5,706.4 m²Builder named
05 Sep 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
6 notices · phased
Newcastle West, Limerick · Limerick City and County Council · Planning ref 22-840
Construction of House Nos. 83-93 Castle Place, Station Road, Newcastle West.
Notice identity Works stated Scale Commenced
CN0120183LL BCMS owner-supplied export
Construction of Apartment Blocks C & D at Nos. 22-27 & 58-63 Castle Place, Station Road, Newcastle West, Co. Limerick.
36 units · 486.4 m²Builder named
30 Sep 2024
SN0011111LL BCMS open-data feed
Construction of Apartment Block E at Nos. 40-51 Castle Place, Station Road, Newcastle West, Co. Limerick.
12 units · 951.6 m²Builder not named
30 Sep 2024
CN0119799LL BCMS owner-supplied export
Construction of Apartment Blocks A & B at Nos. 64-69 & 77-82 Castle Place, Station Road, Newcastle West, Co. Limerick.
36 units · 486.4 m²Builder named
28 Sep 2024
CN0118593LL BCMS open-data feed
Construction of House Nos. 31-39 Castle Place, Station Road, Newcastle West, Co. Limerick
9 units · 932.4 m²Builder not named
19 Aug 2024
CN0114681LL BCMS owner-supplied export
Construction of House Nos. 83-93 Castle Place, Station Road, Newcastle West.
36 units · 1,139.6 m²Builder named
24 Apr 2024
CN0109354LL BCMS owner-supplied export
Construction of House Nos. 1-7 & 70-76 Castle Place, Station Road, Newcastle West, Co. Limerick
36 units · 1,722.4 m²Builder named
31 Jan 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Commenced
1 notice · 1 source identity
Castlebar, Mayo · Mayo County Council · Planning ref 21921
Construction of 75 no. residential units, consisting of detached houses, semi-detached houses, connections to public services, and ancillary site development works
New build
28 Sep 2024 · Commenced
1 notice · 1 source identity
Edgeworthstown, Longford · Longford County Council · Planning ref ABP-313318-22
Construction of 50 no. dwelling houses and associated works at Bloomfield Park, Bracklin Road, Edgeworthstown, Co. Longford
New build
27 Sep 2024 · Latest notice
2 notices · phased
Ashbourne, Meath · Meath County Council · Planning ref 23873
Construction of 40 no. dwellings. Location Dublin Road, Ashbourne, Co. Meath
Notice-stated scale
40 units · 5,041.8 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0120000MH BCMS owner-supplied export
Construction of 40 no. dwellings. Location Dublin Road, Ashbourne, Co. Meath
40 units · 5,041.8 m²Builder not named
27 Sep 2024
SN0011143MH BCMS open-data feed
The development consists of 30 apartments in two blocks connected via a bicycle store and includes associated bin store at site at south of Baltrasna Manor, Western side of the Dublin Road (R135), Ashbourne, Co. Meath
30 units · 3,388 m²Builder not named
27 Sep 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.