The proposed development will consist of the construction of a
Dublin · Dublin
Planning F22A/0460 · Planning application
- Commencement date
- 2026-11-20
- Planning reference
- F22A/0460
- Planning authority
- Fingal County Council
- Project type
- New build
- Floor area
- 625 m² · per notice; not summed
- Indexed source check
- 2026-11-18T03:12:17Z
Works description
The proposed development will consist of the construction of a subterranean Underpass of Runway 16/34, a critical airfield operational safety project, which will comprise: a) A twin-cell enclosed tunnel with 2 no. lanes in each direction, linked to the surface by ramps, portals, and light attenuation screen (1.8m in height above existing ground level at the west ramp and 3.3m in height above existing ground level at the east ramp). The enclosed section will be approximately 0.7 km long, with an overall alignment of approximately 1.1 km in length from top of ramp to top of ramp. It will be approximately 24m in external width, and approximately 5.5m in internal height from road to tunnel ceiling. It will be up to 17.5m below existing ground level; b) Plant room, of approximately 625m2, which will comprise housing for transformers, pumps, controls and communications equipment, located underground at the portal of the east ramp, a parking layby and utilities corridor crossing; c) Demolition (approximately 23,741m2) and reinstatement (approximately 16,216m2) of part of the pavement surfaces of Apron Taxiway 4, Taxiway F-2, Runway 16/34 (the crosswind runway), Taxiway W1 and W2, and the West Apron; d) Access roads to tie in with the existing airside road network at each end of the proposed Underpass (at Pier 3 on the Eastern Campus and the West Apron on the Western campus respectively), and 31no. car parking spaces at surface level at Pier 3; e) Demolition (approximately 97m2) of fixed links (elevated enclosed passenger walkways leading from the Pier to Aircraft Nodes) and Nodes (structures which provide support for the fixed links and internal pedestrian access cores to ground level) serving 3 no. aircraft stands and associated airbridges (passenger boarding bridges) at Level 20 (departure gates) of Pier 3. To the south of Pier 3, an existing airbridge is to be removed and an existing fixed link is to be adjusted to service existing stands in that area; f) Replacement of
This is one commencement notice, retained separately even when it belongs to a grouped project. Personal names, contacts, Eircodes and raw private addresses are not included.