← Complete commencement inventory

BCMS owner-supplied export

Enabling works consisting of installation of storm pipe into

Glanmire, Cork · Cork

Source notice reference
CN0043758CC
Commencement date
2018-09-19
Planning reference
ABP300543-18
Planning authority
Cork City Council
Project type
Material alteration
Indexed source check
2026-06-09T15:11:14Z

Public-safe works description

Enabling works consisting of installation of storm pipe into storm outfall pipe, setup of site compound including demolition of existing structures,demolitio n of existing bungalow, installation of crossing points and exclusion zone for the onsite ESB overhead lines, fencing the boundary of the site, protection of the existing asbestos watermain, stripping of topsoil for phase 1, installation of detention ponds and surface water control and haul road and wheel wash.

This is one source-family notice identity, retained separately even when it belongs to a grouped project. Personal names, contacts, Eircodes and raw private addresses are not included.

Open grouped project and every phase