Commencement notice group

Housing commencement notices — Glanmire

Glanmire, Cork

10 unique commencement events · latest notified commencement 18 Oct 2023 · planning references supplied

Unique commencement events
10
Latest notified commencement
18 Oct 2023
Latest notice
47 houses
Planning references supplied
ABP/300543 · ABP-300543-18
Public location
Glanmire, Cork

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Glanmire, Cork
County
Cork

Notice location variants

  • Ballinglanna, Glanmire, Cork
  • Balliglanna, Cork
Location evidence needs care
  • Notice source points are up to 1.2 km apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 51.921276, -8.374995 Open point
  • Public notice source · 51.919167, -8.388512 Open point
  • Public notice source · 51.919608, -8.386230 Open point
  • Public notice source · 51.921359, -8.382801 Open point
  • Public notice source · 51.919166, -8.387498 Open point
  • Public notice source · 51.921529, -8.390888 Open point
  • Public notice source · 51.919511, -8.389930 Open point
  • Public notice source · 51.919515, -8.390190 Open point
  • Public notice source · 51.918060, -8.387761 Open point
  • Public notice source · 51.916750, -8.390605 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-300543-18. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Construction of 47 no. new dwelling houses and associated site works, nos. 1-47 Springhill (incl.), Glenbourne Ballinglanna, Glanmire, Cork.

Work stated for this notice 47 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 5,034 m².

Appeal reference ABP-300543-18
Notice 2 Commencement notice

Construction of 38 no. new dwelling houses and associated site works, 39 to 76 inclusive, Glenbourne, Ballinglanna, Glanmire, Cork.

Work stated for this notice 38 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 3,463 m².

Appeal reference ABP-300543-18
Notice 3 Commencement notice

Phase 4: Construction of No 1-124 Butlers View, Balliglanna, Glanmire, Co Cork

Work stated for this notice 124 units Explicit phase quantity stated by the source.

Floor area stated for this source: 12,948 m².

Planning reference ABP/300543
Notice 4 Commencement notice

Construction of 13 No dwellings 1-13 Mill View, Ballinglanna, Co Cork

Work stated for this notice 13 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 1,653 m².

Appeal reference ABP-300543-18
Notice 5 Commencement notice

Phase 3: Construction of 18 No housing units, No. 16-24 inclusive Church Green and 27-35 inclusive Church Green, Ballinglanna, Glanmire, Co. Cork.

Work stated for this notice 18 units Explicit phase quantity stated by the source.

Floor area stated for this source: 2,160 m².

Appeal reference ABP-300543-18
Notice 6 Commencement notice

Phase 3: Construction of 30 No housing units, consisting of semi-detached and terraced houses, No. 64-93 inclusive Mill View, Ballinglanna, Glanmire, Co. Cork.

Work stated for this notice 30 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 3,168 m².

Appeal reference ABP-300543-18
Notice 7 Commencement notice

Phase1; Construction of 58 No housing units, consisting of detached, semi-detached and terraced houses, No. 56-81 inclusive Church Green, 131-136 inclusive Church Green and 38-63 inclusive Mill View, Ballinglanna, Glanmire, Co. Cork.

Work stated for this notice 58 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 6,899 m².

Appeal reference ABP-300543-18
Notice 8 Commencement notice

Construction of 36 No housing units, consisting of a mixture of detached, semi-detached and terraced houses, No. 14-37 inclusive Mill View and 44-55 inclusive Church Green, Ballinglanna, Glanmire, Co. Cork.

Work stated for this notice 36 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 3,984 m².

Appeal reference ABP-300543-18
Notice 9 Commencement notice

Construction of 25 No housing units, consisting of a mixture of detached, semi-detached and terraced houses, No. 1-15 inclusive, 25, 26 and 36-43 inclusive Church Green, Ballinglanna, Glanmire, Co. Cork.

Work stated for this notice 25 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 3,456 m².

Appeal reference ABP-300543-18
Notice 10 Commencement notice (owner-supplied)

Enabling works consisting of installation of storm pipe into storm outfall pipe, setup of site compound including demolition of existing structures,demolitio n of existing bungalow, installation of crossing points and exclusion zone for the onsite ESB overhead lines, fencing the boundary of the site, protection of the existing asbestos watermain, stripping of topsoil for phase 1, installation of detention ponds and surface water control and haul road and wheel wash.

Work stated for this notice Scale not stated for this notice.
Appeal reference ABP-300543-18

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.