Commencement notice group
Housing commencement notices — Glanmire
Glanmire, Cork
10 unique commencement events · latest notified commencement 18 Oct 2023 · planning references supplied
- Unique commencement events
- 10
- Latest notified commencement
- 18 Oct 2023
- Latest notice
- 47 houses
- Planning references supplied
- ABP/300543 · ABP-300543-18
- Public location
- Glanmire, Cork
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Glanmire, Cork
- County
- Cork
Notice location variants
- Ballinglanna, Glanmire, Cork
- Balliglanna, Cork
- Notice source points are up to 1.2 km apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 51.921276, -8.374995 Open point
- Public notice source · 51.919167, -8.388512 Open point
- Public notice source · 51.919608, -8.386230 Open point
- Public notice source · 51.921359, -8.382801 Open point
- Public notice source · 51.919166, -8.387498 Open point
- Public notice source · 51.921529, -8.390888 Open point
- Public notice source · 51.919511, -8.389930 Open point
- Public notice source · 51.919515, -8.390190 Open point
- Public notice source · 51.918060, -8.387761 Open point
- Public notice source · 51.916750, -8.390605 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-300543-18. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 47 no. new dwelling houses and associated site works, nos. 1-47 Springhill (incl.), Glenbourne Ballinglanna, Glanmire, Cork.
Floor area stated for this source: 5,034 m².
Construction of 38 no. new dwelling houses and associated site works, 39 to 76 inclusive, Glenbourne, Ballinglanna, Glanmire, Cork.
Floor area stated for this source: 3,463 m².
Phase 4: Construction of No 1-124 Butlers View, Balliglanna, Glanmire, Co Cork
Floor area stated for this source: 12,948 m².
Construction of 13 No dwellings 1-13 Mill View, Ballinglanna, Co Cork
Floor area stated for this source: 1,653 m².
Phase 3: Construction of 18 No housing units, No. 16-24 inclusive Church Green and 27-35 inclusive Church Green, Ballinglanna, Glanmire, Co. Cork.
Floor area stated for this source: 2,160 m².
Phase 3: Construction of 30 No housing units, consisting of semi-detached and terraced houses, No. 64-93 inclusive Mill View, Ballinglanna, Glanmire, Co. Cork.
Floor area stated for this source: 3,168 m².
Phase1; Construction of 58 No housing units, consisting of detached, semi-detached and terraced houses, No. 56-81 inclusive Church Green, 131-136 inclusive Church Green and 38-63 inclusive Mill View, Ballinglanna, Glanmire, Co. Cork.
Floor area stated for this source: 6,899 m².
Construction of 36 No housing units, consisting of a mixture of detached, semi-detached and terraced houses, No. 14-37 inclusive Mill View and 44-55 inclusive Church Green, Ballinglanna, Glanmire, Co. Cork.
Floor area stated for this source: 3,984 m².
Construction of 25 No housing units, consisting of a mixture of detached, semi-detached and terraced houses, No. 1-15 inclusive, 25, 26 and 36-43 inclusive Church Green, Ballinglanna, Glanmire, Co. Cork.
Floor area stated for this source: 3,456 m².
Enabling works consisting of installation of storm pipe into storm outfall pipe, setup of site compound including demolition of existing structures,demolitio n of existing bungalow, installation of crossing points and exclusion zone for the onsite ESB overhead lines, fencing the boundary of the site, protection of the existing asbestos watermain, stripping of topsoil for phase 1, installation of detention ponds and surface water control and haul road and wheel wash.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.