Commencement notice

The proposed development represents Phase 2 of Alexion’s

Blanchardstown Road North, Blanchardstown, Dublin · Dublin

Commencement date
2015-11-14
Planning reference
FW15A/0067
Planning authority
Fingal County Council
Project type
New build
Indexed source check
2026-06-09T15:11:14Z

Works description

The proposed development represents Phase 2 of Alexion’s biopharmaceutical manufacturing campus and includes 6 no. buildings with a total floor area of 30,994 square metres, together with external utility areas and associated site works. The development provides for the following:- a four-storey 21,869 square metre and 42.5 metre high manufacturing building including intermediate level mezzanines and boiler flue stack (to 48.5 metres height); a single-storey 3,626 square metre and 16 metre high warehouse extension; a two-storey 4,563 square metre and 13.5 metre high central utilities building; a utilities yard and wastewater treatment area. The ancillary external utilities within the utility yard will consist of; a single storey control building, single storey pump house, single-storey drum storage building, single storey electrical building, process water and waste water storage tanks, bunded water treatment chemical tanks, bunded fuel storage tank and back-up electrical generators; each of these facilities will be accessible via a single-storey internal access corridor running through the spine of the campus with elevated utility rack. The development also includes:- a staff entrance lobby extension to the western elevation of the Phase 1 internal access corridor; car parking for an additional 220 vehicles; an electrical substation building with separate access off Cruiserath Road; continued provision of temporary construction access off Cruiserath Road to be maintained as an emergency vehicle access and egress following construction with the main access serving the proposed development from the south of the site. The development provides for ancillary site works including additional internal access roads, an additional fire water sprinkler tank, underground services, lighting, 70 bicycle parking spaces, 10 motorcycle spaces, CCTV, soft and hard landscaping and increase to size of surface water attenuation pond to the southeast of the site, all on a site measuring

This is one commencement notice, retained separately even when it belongs to a grouped project. Personal names, contacts, Eircodes and raw private addresses are not included.