Commencement notice group

Commencement notices — Blanchardstown Road North

Blanchardstown Road North, Blanchardstown, Dublin

2 unique commencement events · latest notified commencement 14 Nov 2015 · planning reference supplied

View full project timeline

Unique commencement events
2
Latest notified commencement
14 Nov 2015
Latest notice
Scale not stated
Planning references supplied
FW15A/0067
Public location
Blanchardstown Road North, Blanchardstown, Dublin

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Blanchardstown Road North, Blanchardstown, Dublin
County
Dublin

No usable public source coordinate or reviewed official planning boundary is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The proposed development represents Phase 2 of Alexion’s biopharmaceutical manufacturing campus and includes 6 no. buildings with a total floor area of 30,994 square metres, together with external utility areas and associated site works. The development provides for the following:- a four-storey 21,869 square metre and 42.5 metre high manufacturing building including intermediate level mezzanines and boiler flue stack (to 48.5 metres height); a single-storey 3,626 square metre and 16 metre high warehouse extension; a two-storey 4,563 square metre and 13.5 metre high central utilities building; a utilities yard and wastewater treatment area. The ancillary external utilities within the utility yard will consist of; a single storey control building, single storey pump house, single-storey drum storage building, single storey electrical building, process water and waste water storage tanks, bunded water treatment chemical tanks, bunded fuel storage tank and back-up electrical generators; each of these facilities will be accessible via a single-storey internal access corridor running through the spine of the campus with elevated utility rack. The development also includes:- a staff entrance lobby extension to the western elevation of the Phase 1 internal access corridor; car parking for an additional 220 vehicles; an electrical substation building with separate access off Cruiserath Road; continued provision of temporary construction access off Cruiserath Road to be maintained as an emergency vehicle access and egress following construction with the main access serving the proposed development from the south of the site. The development provides for ancillary site works including additional internal access roads, an additional fire water sprinkler tank, underground services, lighting, 70 bicycle parking spaces, 10 motorcycle spaces, CCTV, soft and hard landscaping and increase to size of surface water attenuation pond to the southeast of the site, all on a site measuring

Work stated for this notice Scale not stated for this notice.
Planning reference FW15A/0067
Notice 2 Commencement notice

Enabling works and bulk excavation for Phase 2 of Alexion’s biopharma manufacturing campus. No foundations or other building works are included in the works covered by this Commencement Notice. The enabling works will clear the site and form a new construction compound for subsequent building works. The enabling works also includes site hoarding, a stoned working platform for the subsequent building works and the provision of site access roads and temporary car parking areas. The bulk excavation will reduce the site levels to those appropriate for the subsequent building works. Drawing numbers IE-DR-0210, IE-DR-0220 and IE-DR-0230 show the nature and extent of the works covered by this Commencement Notice. A separate Commencement Notice “with documentation” will be submitted in advance of the commencement of the subsequent building works.

Work stated for this notice Scale not stated for this notice.
Planning reference FW15A/0067

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.