← Complete commencement inventory
Extensions and Material Alterations to Irish Life Block 3 Office
Dublin 1, Dublin · Dublin
- Commencement date
- 2023-05-15
- Planning reference
- 3622/21
- Planning authority
- Dublin City Council
- Project type
- Extension · Material alteration · Change of use
- Floor area
- 28016 m² · per notice; not summed
- Indexed source check
- 2026-06-09T15:11:14Z
Works description
Extensions and Material Alterations to Irish Life Block 3 Office Building (Blk 3A + Blk 3B + Leisure Centre) to include the following: - The construction of an additional floor bringing the total number of floors from 10 floors (ground floor plus 9 upper floors) to 11 floors (ground floor plus 10 upper floors). - An extension of the existing 7th, 8th & 9th floors including the construction of a new firefighting shaft. - A small extension to level 02 - 06. - An extension to the existing level 01 office floor onto the existing roof level car park. - A small extension to ground floor to the front of the Block 3. - Material alterations to the existing leisure centre in Block 3 that includes refurbishment. - Alterations at basement level that includes, the installation of a new mechanical smoke clearance system, the addition of various M&E plant rooms, the addition of two lobbies to the existing stairs serving the Leisure Centre at the upper levels, and the Introduction of new cage bicycle storage.
This is one commencement notice, retained separately even when it belongs to a grouped project. Personal names, contacts, Eircodes and raw private addresses are not included.