Site start

Commercial site start — Dublin

Dublin 1, Dublin

1 commencement notice · start date 15 May 2023 · planning reference given

Planning 3622/21 · Planning application

View full project timeline

Commencement notices
1
Latest start date
15 May 2023
Latest notice
28,016 m²
Planning reference
3622/21
Location
Dublin 1, Dublin

Location

Where the site is

Area
Dublin 1, Dublin
County
Dublin

Addresses on the notices

  • basement level that includes, the installation of a new mechanical smoke
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Extensions and Material Alterations to Irish Life Block 3 Office Building (Blk 3A + Blk 3B + Leisure Centre) to include the following: - The construction of an additional floor bringing the total number of floors from 10 floors (ground floor plus 9 upper floors) to 11 floors (ground floor plus 10 upper floors). - An extension of the existing 7th, 8th & 9th floors including the construction of a new firefighting shaft. - A small extension to level 02 - 06. - An extension to the existing level 01 office floor onto the existing roof level car park. - A small extension to ground floor to the front of the Block 3. - Material alterations to the existing leisure centre in Block 3 that includes refurbishment. - Alterations at basement level that includes, the installation of a new mechanical smoke clearance system, the addition of various M&E plant rooms, the addition of two lobbies to the existing stairs serving the Leisure Centre at the upper levels, and the Introduction of new cage bicycle storage.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 28,016 m².

Planning reference 3622/21

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.