Commencement notice

Tenant Fit-Out of Building 100, Capital Dock, Dublin 2

Dublin 2, Dublin · Dublin

Commencement date
2019-07-01
Planning reference
Not indexed
Planning authority
Dublin City Council
Project type
Material alteration
Floor area
11279 m² · per notice; not summed
Indexed source check
2026-06-09T15:11:14Z

Works description

Tenant Fit-Out of Building 100, Capital Dock, Dublin 2. This Commencement Notice relates to fit-out works to Building 100, Capital Dock, Dublin 2, to include the following deferred works detailed on the Completion Certificate from Commencement Notice No:: 1. Wall and floor finishes to ensure Part M compliance giving level access in the reception, lift lobbies, lift cars and office floor plates. 2: Ceilings in the reception, lift lobbies and office floor plates including associated cavity barriers. 3: Mechanical ventilation installation within the reception, lift lobbies and office floor plates. Air and water balancing of previously installed Fan Coil Units (FCU) to allow temperature management. 4: Switches, outlets and control units to ensure Part M compliance within the reception, lift lobbies and office floor plates. 5: Fire and Life safety systems, including emergency lighting within the reception, lift lobbies and office floor plates. 6: All artificial lighting throughout the reception, lift lobbies and office floor plates. 7. Blind installation in the reception to ensure Part L compliance. 8. Recommissioning of lifts upon completion of fit-out works. 9. Installation of liner to core walls. 10. Architectural Joinery in all lift lobbies. 11. Turnstiles service opes infill as they relate to Part M compliance. 12. Internal glazing in reception at Level 1. The project includes the CAT-B fit-out of all office floor plates and the reception area, which are exempt from the requirements of the Fire Safety Certificate Applications and the Disability Access Certificate Application.

This is one commencement notice, retained separately even when it belongs to a grouped project. Personal names, contacts, Eircodes and raw private addresses are not included.