Site start

17 Green Street East, Dublin 2

Dublin 2, Dublin

1 commencement notice · start date 01 Jul 2019 · no planning reference given

Commencement notices
1
Latest start date
01 Jul 2019
Latest notice
11,279 m²
Planning references
None given
Location
17 Green Street East, Dublin 2

Location

Where the site is

Area
Dublin 2, Dublin
County
Dublin

Addresses on the notices

  • 17 Green Street East, Dublin 2
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice

Tenant Fit-Out of Building 100, Capital Dock, Dublin 2. This Commencement Notice relates to fit-out works to Building 100, Capital Dock, Dublin 2, to include the following deferred works detailed on the Completion Certificate from Commencement Notice No:: 1. Wall and floor finishes to ensure Part M compliance giving level access in the reception, lift lobbies, lift cars and office floor plates. 2: Ceilings in the reception, lift lobbies and office floor plates including associated cavity barriers. 3: Mechanical ventilation installation within the reception, lift lobbies and office floor plates. Air and water balancing of previously installed Fan Coil Units (FCU) to allow temperature management. 4: Switches, outlets and control units to ensure Part M compliance within the reception, lift lobbies and office floor plates. 5: Fire and Life safety systems, including emergency lighting within the reception, lift lobbies and office floor plates. 6: All artificial lighting throughout the reception, lift lobbies and office floor plates. 7. Blind installation in the reception to ensure Part L compliance. 8. Recommissioning of lifts upon completion of fit-out works. 9. Installation of liner to core walls. 10. Architectural Joinery in all lift lobbies. 11. Turnstiles service opes infill as they relate to Part M compliance. 12. Internal glazing in reception at Level 1. The project includes the CAT-B fit-out of all office floor plates and the reception area, which are exempt from the requirements of the Fire Safety Certificate Applications and the Disability Access Certificate Application.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 11,279 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.