Commencement notice group

Building extension commencement notices — Slane

Slane, Meath

2 unique commencement events · latest notified commencement 03 Feb 2016 · planning reference supplied

Unique commencement events
2
Latest notified commencement
03 Feb 2016
Latest notice
1 house
Planning references supplied
LB/150172
Public location
Slane, Meath

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Slane, Meath
County
Meath
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The site is located within the Slane Castle Demesne Architectural Conservation Area. The proposal comprises the creation of a new whiskey distillery and visitor centre and associated development to be set within the existing two storey East Stableyard, west single storey Courtyard, the East, Middle and West Farmyards and the Gardener’s (Edie’s) Cottage and Gardens. This phase involves the construction of the RAW water pump house

Work stated for this notice 1 house Explicit phase quantity stated by the source.
Planning reference LB/150172
Notice 2 Commencement notice

The site is located within the Slane Castle Demesne Architectural Conservation Area. The proposal comprises the creation of a new whiskey distillery and visitor centre and associated development to be set within the existing two storey East Stableyard, west single storey Courtyard, the East, Middle and West Farmyards and the Gardener’s (Edie’s) Cottage and Gardens. The proposal includes the restoration and repair of existing buildings to sensitively adapt them to the new distillery and visitor centre uses. The proposal minimises internal and external alterations to the existing building fabric. Where new construction is required to supplement the existing structures, it has been carefully sited and designed with appropriate materials and scale to cause the least impact to the historic setting. The site for the development is located approximately 110m to the northwest of Slane Castle. This phase involves works to Shell and core finish in Block A, B(north), D(north), J and to completion in Block B (south), C, D (south), E, F, G, G-g, . Miscellaneous site works to include installation of new gates, gate piers, boundary treatments, car / coach / bicycle parking, internal path / roadways etc. Site development works include provision of a packaged waste treatment plant and percolation field for foul waste and decommissioning of septic tank at Castle. Surface water attenuation for the site will be provided by SUDS methods including swales to be located in the woodlands to the south of the Stableyard, Courtyard and Middle Farmyard. Water will be sourced from [3] sources including the River Boyne, through an on site borehole and collected rainwater (grey water). Re-circulated cooling water, and cleaned distillation process water, will be discharged back to the River Boyne. New, sensitively-designed inlet and outlet pipes will be constructed to the River Boyne. It is proposed to restore the derelict millpond, weir, millrace and sluice, and to create a new fish pass to accomm

Work stated for this notice 4 units Explicit phase quantity stated by the source.
Planning reference LB/150172

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.