Commencement notice group
Commercial commencement notices — Dublin
Dublin, Dublin
3 separate notices · latest notified commencement 04 Sep 2025 · planning reference supplied
- Source notices
- 3
- Latest notified commencement
- 04 Sep 2025
- Latest notice
- 16,893 m²
- Planning references supplied
- 3372/23
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- Crumlin, Dublin 12 as highlighted in green in drawing FC02 Proposed Site Layout uploaded with this Commencement Notice
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Crumlin Shopping Centre Redevelopment – The construction of a new shopping centre and associated works. The construction will be broken into 3 phases. Phase 1 – Construction of the main Dunnes unit finished to shell and core standard to allow the fit-out of the unit to take place (under a separate FSC application and Commencement Notice). Phase 2 – Construction and completion of 6 no. retail units to shell and core standard along with the completion of the mall and public toilets. Phase 3 – Demolition of the existing Dunnes unit and construction of a new food hall to shell and core standard. The phasing plan, including phasing drawings, can be viewed in the Supporting Documents section (under AI1.1-Phasing Plan and AI1.2-Phasing Drawings) with this 7 Day Commencement Notice. The fit-out of the substation building for M&E services will also be completed. Please note that the existing Dunnes unit will remain open to trade until the beginning of Phase 3.
16,893 m² · stated on this notice
Construction of a ESB Substation, MV Switch Room, FM Switch Room and Client Transformer Room as part of the Crumlin Shopping Redevelopment at Crumlin, Dublin 12 as highlighted in green in drawing FC02 Proposed Site Layout uploaded with this Commencement Notice. Please note that the fit-out of the building including the electrical equipment and life safety systems will be completed as part of the shopping centre construction due to begin in summer 2025.
90 m² · stated on this notice
Demolition of the existing Crumlin Shopping Centre and site enabling works in preparation for the construction of a new shopping centre with a separate Commencement Notice proposed to be submitted in summer 2025. Please note that the existing Dunnes retail unit will be open to trade during these works as shown in drawing 1004 Site Plan - Demolition, uploaded with this Commencement Notice
11,444 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.