Site start

Housing site start — Athy

Athy, Kildare

1 commencement notice · start date 24 Jun 2024 · planning reference given

Planning 23/378 · Council file · external

View full project timeline

Commencement notices
1
Latest start date
24 Jun 2024
Latest notice
1 house
Planning reference
23/378
Location
Athy, Kildare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Athy, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 23/378. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

i) Repositioning of the current front door to the eastern side of the dwelling, the removal of the flat roof on the current single storey extension and addition of a new matching pitch roof and infill extension to the rear to facilitate a new utility room. The lowering of the current cottage style windows and the addition of a new opaque matching window into the bathroom area into the front elevation. Removal of the western gable wall and insertion of a new fully glazed opening into the living/kitchen area with overhang roof canopy. ii) Relocation of the existing vehicle entrance. iii) Construction of a new workshop/garage to the rear of the property

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 98 m².

Planning reference 23/378

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.