Causeway, Kerry
1 unique commencement event · latest notified commencement 25 Mar 2015 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 25 Mar 2015
- Latest notice
- Scale not stated
- Planning references supplied
- 13/252
- Public location
- Causeway, Kerry
Public source geography
Site location
- Public site / locality
- Causeway, Kerry
- County
- Kerry
No usable public source coordinate is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development generally consists of the construction of a new single storey extension to the south east side of the existing school building, adjacent to the main entrance, comprising 2no. resource rooms, 2no. offices and an access corridor. Proposed demolition work to the existing school involves the removal of an existing office to provide for the access corridor to the new extension. A new roof will extend from the current existing roof planes resulting in the new ridge and parapet levels matching and 'tying- in' with existing levels. Alterations to the existing facade include a new window to the existing Principals office and a new glazed external doorway from the existing staff room to outside. The extension will be of masonry construction with rainscreen cladding and a built-up PVC roof. Related external works include connection to existing drainage, an entrance canopy, seating and alterations to existing paving and parking area.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.