Commencement notice group
Building extension commencement notices — Dublin
Dublin 2, Dublin
1 unique commencement event · latest notified commencement 06 Aug 2014 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 06 Aug 2014
- Latest notice
- Scale not stated
- Planning references supplied
- None stated
- Public location
- Dublin 2, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 2, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Internal and external alterations to 4 storey over basement structure to front and two to three storey stairs at rear to include:Construction of new stairs from basement to second floor with new roof and wall cladding at second floor level, together with new enclosed link corridor at second floor level from front building to rear stairs, new window at rear of second floor at location of previous window, previously removed. Alterations to front elevation comprising removal of existing shopfront and roller shutters, new shopfront and signage to shopfront to include new glazed doors.
Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.